![Cersanit Nano S301-061 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/cersanit/nano-s301-061/nano-s301-061_mounting-and-maintenance-instructions_2583736007.webp)
GB
INSTRUCTIONS FOR THE MOUNTING AND MAINTENANCE
OF ACRYLIC BATHTUBS
Tab. 1. Distance between the mounting frames for various types of bathtubs (see fig.A)
Tab. 2. Quantity (in pcs) of elements for mounting particular types of bathtubs and enclosures
1. Bathtub (a sample)
2, 3, 4. Mounting frame
5. Wood screws
6, 7. Leg nuts
8, 9. Washers
10, 11. Bathtub feet
12, 13. Feet base plate
14. Metal brackets
15. Raw plugs
16. Wall screws
17, 18, 19. Threaded bars
A) Mounting of the mounting frames to the bathtub base.
B) Screwing the legs to the bathtub
C) Levelling of the bathtub
D) Arrangement of the brackets for mounting of the bathtub to the wall
E) Mount the brackets with two holes permanently in the wall corner; the brackets with
oblong holes are used for the correct levelling of the product.
F) A correct manner in which the bathtub is mounted to the wall
G, H) An incorrect manner in which the bathtub cannot be mounted to the wall
1. Before installation of the bathtub the product should be thoroughly checked. After mounting
the bathtub, only production and material defects will be covered by the guarantee.
2. Each bathtub is protected by protective foil and cardboard which protects the products
against mechanical damage. The protective foil can be removed only when the mounting
of the bathtub to the wall is completed.
3. Before the bathtub is installed, water inlet and outlet holes must be prepared. The floor on
which the bathtub will be mounted must be levelled.
4. Each bathtub has mounting elements attached, which are specified in table no 2.
5. As the first ones, 2 mounting frames - channel sections (2,3,4) should be mounted on the
base of the bathtub with wood screws (5) fig. A. The spacing between the frames depends
on the size of the bathtub, and the spacing between the frames for a given type of the
bathtub are specified in Table no 1.
The channel sections should be mounted perpendicularly to the axle of the bathtub base
and be fastened to the reinforcing element made of chipboard located in the bathtub base.
6. Next, connect bars (16,17,18) with feet (10,11) and mount base plates (12) on them.
Screw the legs in to the frames and level the whole bathtub using the nuts (6,7).
7. The mounting set includes also metal brackets (13) for mounting the bathtub to the wall.
The arrangement of the brackets is shown in fig. D, and the manner in which they are
mounted on the walls is shown in fig. E. Avoid sinking the bathtub sides into the walls
fig. G., or enclosing with tiles fig. H.
The bathtub should be mounted in a manner which allows for demounting without a
damage to the permanent enclosure.
8. After fastening of the bathtub to the wall, mount the traps, connect them to place of water
discharge and check water tightness of the elements mounted.
9. After mounting of the bathtub is completed, remove the protective foil from the bathtub.
10. For sealing the gaps use silicon filler only, apply the filled between the bathtub edge and
the wall. Before sealing with silicon filler, fill the bathtub with water up to the overflow level
and check whether the bathtub is stable.
Содержание Nano S301-061
Страница 2: ...MAX 9 0 o MAX 90 o B 120 150 MAX A 9 0 o 90 o W S S W W 9 1 10 3 2 10 6 10 11 S...
Страница 3: ...C OK C2 C1...
Страница 4: ...I H D G E F 4 5 b 8 7 a b a...
Страница 12: ...Cersanit Cersanit S A Cersanit S A Cersanit S A 7 21 Cersanit S A RU...
Страница 14: ...Cersanit Cersanit S A Cersanit S A Cersanit S A 7 21 Cersanit S A UA...
Страница 35: ...20 4 7 3 0 200 wer...