Century FW3300 Installation and Operation Manual
4
5
Maintaining Your Wood Heating System ....................................... 22
5.1
Stove Maintenance ............................................................................................... 22
5.1.1
Cleaning Door Glass ......................................................................................... 22
5.1.2
Replacing the Door Gasket ............................................................................... 23
5.1.3
Replacing the Glass Gasket and/or the Glass .................................................. 23
5.1.4
Cleaning and Painting the Stove ....................................................................... 24
5.2
Chimney and Chimney Connector Maintenance .................................................. 25
5.2.1
Why Chimney Cleaning is Necessary ............................................................... 25
5.2.2
How Often Should You Clean the Chimney? .................................................... 25
5.2.3
Cleaning the Chimney ....................................................................................... 25
PART B - INSTALLATION .................................................................. 26
6
Safety Information ............................................................................. 26
6.1
Summary of Installation Cautions and Warnings .................................................. 26
6.2
Regulations Covering Stove Installation ............................................................... 26
7
Clearances to Combustible Material ............................................... 27
7.1
Location of the certification label .......................................................................... 27
7.2
Clearances to Walls and Ceiling........................................................................... 27
7.3
Floor protector ...................................................................................................... 29
7.4
Reducing Wall and Ceiling Clearances Safely ..................................................... 30
7.4.1
Shield Construction Rules ................................................................................. 30
7.4.2
Table of Clearance Reduction Percentages ...................................................... 31
8
The Venting System ........................................................................... 32
8.1
General ................................................................................................................ 32
8.2
Suitable Chimneys ............................................................................................... 32
8.2.1
Factory-built Metal Chimneys ............................................................................ 33
8.2.2
Masonry Chimneys ........................................................................................... 34
8.3
Minimum Chimney Height .................................................................................... 34
8.4
The Relationship Between the Chimney and the House ...................................... 35
8.4.1
Why inside chimneys are preferred ................................................................... 35
8.4.2
Why the chimney should penetrate the highest heated space .......................... 36
8.5
Supply of Combustion Air ..................................................................................... 36
8.5.1
Air Supply in Conventional Houses ................................................................... 36
8.6
Installing the Chimney Connector ......................................................................... 37
8.6.1
Installation of Single Wall Chimney Connector ................................................. 37
Содержание FW3300
Страница 8: ...Century FW3300 Installation and Operation Manual 8 ...
Страница 28: ...Century FW3300 Installation and Operation Manual 28 Clearances to combustible materials and floor protection ...
Страница 45: ...Century FW3300 Installation and Operation Manual 45 Appendix 4 Exploded Diagram and Parts List ...