1
To remove floorboard:
• Unfasten attachment straps.
• Remove floorboard and set
aside.
2
To unlock and raise floor:
• Push down on center of
Playard/Crib floor.
• Lift
Floor Handle
and rotate
in direction of arrow
(counterclockwise).
• Pull up on
Floor Handle
to
raise floor.
Raise approximately
45.7 cm
(18 inches).
3
To fold top rails:
• Pull up on top rail slightly.
• Squeeze
Release Button
on bottom of top rail and
push rail down. (Release
buttons are identified by
printed arrows.)
Repeat for other sides.
NOTE:
• If rails are difficult to
unlock, raise center of
floor higher and
squeeze
Release
Button
again.
• If only one side of rail
folds, squeeze
Release
Button
again to fully
fold.
FOLDING and STORING continued
8
Playard/Crib
4
Gather Playard/Crib frame together
while pulling up on
Floor Loop
.
5
Wrap floorboard around
Playard/Crib frame with
padding facing in.
NOTE:
Floorboard
Handle MUST
be aligned with wheels as shown.
6
Secure
Attachment Straps:
• Bottom - Thread
Attachment
Strap
through
Leg Loop
then
through
Floorboard Loop
and fold back onto itself.
• Middle and Top - Thread
Attachment Straps
through remaining
floorboard loops
and fold back onto
themselves.
7
Position travel bag over
Playard/Crib so
Handle
comes
through
Opening
in side of bag.
Pull travel bag over Playard/Crib.
Pull
Floor Loop
through
opening on top of travel bag.
NOTE:
To prevent rubbing,
make sure travel bag is
positioned above wheels.
Release
Button
Floor
Handle
Handle
Attachment
Straps
Floor Loop
Handle
Opening
Floor Loop
Leg Loop
Floorboard Loop