General considerations for the installation
For comprehensive information, please refer to the full installation
manual available for download on
www.centsys.co.za
&
It will not pose a hazard to the public
&
There is sufficient clearance to a roadway and/or public
thoroughfares
&
The installation will meet all municipal and/or local authority
requirements once completed
&
The gate mass, length and application is within the operator
specifications
&
The gate is in good working order, meaning:
&
That it moves freely
&
Does not move on its own if left in any position
&
It can be installed to have sufficient clearance between
moving parts when opening and closing to reduce the risk of
personal injury and entrapment
&
Pushbuttons or key switches, when required, can be
positioned so that the gate is in line of sight of the operator
Install the gate operator only if:
Guide rollers must ensure that
the gate is held vertically though
the entire length of the gate
travel. For improved safety fit
additional support post to
prevent gate from falling over
if guide rollers fail
Make sure the gate mass,
starting - and rated-pull-force
limitations are not exceeded
Ensure that the gate
cannot be lifted off the
motor pinion with the
anti-lift bracket fitted
Pull scale
Guide rollers
Additional
support post
GAP<5mm
GAP<5mm
GAP<5mm
GAP<5mm
Typical anti-lift
arrangements