page 40
www.centsys.com
OPERATOR INSTALLATION
SECTION 7
Once the rack has been fixed to the entire length of the gate, use a screwdriver to
carefully remove the Pinion Spyder from the Pinion of the D5 SMART.
Place the Ring Lug-end of the Earth
Harness onto the mounting bolt on
the right-hand side of the Gearbox.
FIGURE 64
FIGURE 65
FIGURE 66
Slide the D5 SMART away
from the gate so that the
rack is centred above the
Pinion.
Final adjustment to the
position of the gearbox
should be done at this
point.
To ensure that the Earth
Harness is able to reach the
Charger once connected to
the mounting bolt,
it is recommended that it
is positioned at the angle
depicted by the middle
line, but not at an angle
exceeding the lines at
either side of it as the Earth
Harness will not be able to
reach the Charger.
Pinion
Pinion Spyder
Screwdriver
Gearbox
Do not
exceed this
angel
Do not
exceed this
angel
Middle Line
(Ideal position)
Ring Lug
Mounting
Bolt
Ring Lug
Earth Harness
Gate
7.9.2. Finalising the Height Adjustment
7.9.2.1. Placing and Routing the Earth Harness