TECHNICAL INSTRUCTIONS 

 

FOR THE COMMISSIONING AND ADJUSTMENT

 

 

Cm Pelet-set - touch 

(60-90 kW) 
 

For boilers:

  

EKO-CK P 70-110 

 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

TUPS-90-T-07-2017-E-N-eng_1.07 

Содержание Cm Pelet-set 90

Страница 1: ...o Glavna 12 40306 Macinec Croatia tel 385 40 372 600 fax 385 40 372 611 TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet set touch 60 90 kW For boilers EKO CK P 70 110 TUPS 90 T 07 2017 E N eng_1 07 ...

Страница 2: ... set 90 4 1 Installation of pellet burner and pellet control unit on boiler 4 2 Installation of pellet tank CPSP 800 and pellet feeder CPPT 90 5 Start stop 6 Draught of the chimney 7 Automatic pellet refill 8 Initial setting of the regulation 8 1 Setting the configuration 8 2 Setting the protection valve actuator time 3 3 3 5 5 8 9 10 10 10 11 11 12 ...

Страница 3: ...ler control unit CPREG touch 4 pellet feeder CPPT 90 5 pellet tank CPSP 800 3 Technical data Description 1 pellet burner CPPL 90 2 tube for connecting of pellet feeding flexible tube 3 connectors for connecting of burner with control unit 4 Backfilling sensor temperature sensor on inlet tube that is installed tube for connecting of pellet feeding flexible tube backfilling sensor is detailed in the...

Страница 4: ...90 Set thermal output kW 60 70 90 Boiler type EKO CK P 70 EKO CK P 90 EKO CK P 110 Pellet tank volume l 800 Pellet tank height mm 1420 Pellet tank depth mm 980 Pellet tank width mm 1010 Supply voltage V Hz 230 50 Boiler width mm 640 690 690 Lower boiler door CPDV mm CPDV 60 70 for burner CPPL 90 for boiler EKO CK P 70 and CPDV 90 110 for boilers EKO CK P 90 i 110 ...

Страница 5: ...ker gasket toward door and thinner gasket on the side away from door onto prepared screws on the door then place a feeding box and tighten the screws with enclosed nuts M8 Put a gasket onto the feeding box and put a feeding tube onto it faced toward the pellet tank either on the left or on the right side and tighten it firmly using enclosed screws M4 x 30 Connect 3 pin plug of the backfilling sens...

Страница 6: ...Technical instructions for the commissioning and adjustment 6 ...

Страница 7: ...r temperature gauge on inlet tube and other end should be fixed to the feeder so that the tube will not become loosen Transparent tube between the feeder and burner must be as straight as possible so that pellets can fall smoothly from the feeder into the burner if pellets remain in the tube it should be straighten and shorten if necessary g Connect a wire for power supply to the screw feeder CPPT...

Страница 8: ... 90 and 110 with in built Cm Pelet set 90 on heating installation with accumulation tank 1 Boiler EKO CK P 70 90 110 with in built Cm Pelet set 90 2 Accumulation tank CAS 3 Heating pump between boiler and accumulation tank CAS 4 Sanitary water sensor at the lowest sensor sleeve on the accumulation tank 5 3 way thermostat valve for outlet protection as ESBE VTC 512 VTC 531 LTC 141 or Laddomat 21 or...

Страница 9: ...m it pressing the OK button To stop the boiler press ON OFF button and confirm it pressing the OK button 6 Draught of the chimney Chimney of appropriate size is one of conditions for proper operation of the boiler Chimney has to be select according to diagram for solid fuel firing see Technical instructions EKO CK P or EKO CKB P or a chimney with the following minimum draughts has to be select for...

Страница 10: ...wer supply for the filling system LED main switch on when there is power supply Operation mode switch select working mode 0 OFF disabled 1 Auto filling working until tank sensor stops it 2 Manual filling working until manual switching off doesn t working according to tank sensor LED filing on when filling is working manual or auto ...

Страница 11: ...press Installation button SERVICE PIN required 3 In Installation menu press Commissioning button 4 In Commissioning menu press Configuration button 5 In Configuration menu press Configuration button 6 In Configuration menu set scheme 1 scheme CODE 3 characters 2 buttons for changing the values 3 scheme description 7 Set scheme current B 0 0 Confirm it with OK button blue button ...

Страница 12: ...tton 3 In Valve time setting set protection valve actuator opening closing time it depends on the build in protection valve actuator Centrometal d o o shall not be responsible for possible incorrect data caused by printing errors or errors during transcription and in any case it reserves the right to modify its products deemed to be required and useful without any prior notification 1 07 Macinec 0...