background image

5. Typical wiring connections

Basic 

Boiler

Combi 

Boiler

Zone 

Valve

Electric 

Actuator

7. Install the batteries (included)

8. Attach the instruction label to flap

6. Attach the cover to backplate

3

1

2

Содержание EHE0200153

Страница 1: ...se 1 Find a suitable location for mounting This product has been designed with your environment in mind Please respect this by disposing of all packaging used parts and eventually the product itself in an environmentally friendly manner Please follow the illustrations below to install the thermostat correctly 3 Mount the backplate to wall 2 Remove from packaging 4 Connect the wiring correctly M3 5...

Страница 2: ...5 Typical wiring connections Basic Boiler Combi Boiler Zone Valve Electric Actuator 7 Install the batteries included 8 Attach the instruction label to flap 6 Attach the cover to backplate 3 1 2 ...

Страница 3: ...er to 12 Zone Valve 6 1 No changes required Electric Heating 12 1 Set 2 Cr parameter to 12 resistive load 3 5A Entering the Installer Mode 1 Press the OFF button 2 Press and hold the button and the two PROGRAM and buttons together 3 The unit will display the first parameter of installer parameter group category 1 from Parameter No 1 to 20 4 Press the or button to change the factory setting The dis...

Страница 4: ...m ON time 6 cycles per hour cph Pump exercise disabled Display 12 0 1 21 to 34 6 to 20 3 to 3 1 6 to 3 0 0 1 2 to 5 3 9 12 1 Description 12 hr AM PM clock display format Time Temperature are as programmed To restore the factory profile set to 1 21 C to 34 C adjustment in 1 C steps 6 C to 21 C adjustment in 1 C steps 3 C to 3 C adjustment in 0 1 C steps 1 6 C to 3 0 C adjustment in 0 1 C steps Sett...

Отзывы: