55
V10.19
CellarPro Split Systems must be installed by an experienced professional in adherence with industry practices
and as described in the manual. If you need technical assistance during the installation, call 877.726.8496 x2.
Tech Name:
____________________
Tech Phone:
______________
Date of Measurement:
_____________
System Information
Piping Information
MM/DD/YY
Customer Name
R-134a System Charge
(lb)
Condensing Unit Model #
Line-set Length (ft)
Condensing Unit Serial #
Liquid line diameter (OD)
Evaporator Model #
Suction line diameter (OD)
Evaporator Serial #
Trap installed in drain line,
charged with water, and
tested for drainage (Y/N)
Operation Start Date
Power to Condensing Unit (Check One)
____ From Evaporator ____ From External Source
Power to Compressor Heater (Check One)
- 3000S – 8000S Split Systems
- AH6500 / AH8500S Split Systems
____ No Heater
____ Wire “L1” ____ Wire “C”
____ No Heater
____ Terminal “L1” ____ Terminal “K”
Initial Refrigerant Charge Through (Check One)
____ Suction Access Valve ___ Liquid Access Valve
Operational Data:
Take the following measurements during a normal refrigeration cycle, once the cellar has pulled down
to the set-point temperature. Make sure the compressor is running when recording the data
.
Evaporator
Range
Air temp. at Evap coil (°F)
Inlet
Outlet
TD
8-10°F TD
Evaporator power supply
Volts
Amps
103-127V
nameplate amps
Condensing Unit
Air temp at Condenser coil (°F)
Inlet
Outlet
TD
20-30°F TD
Condenser fan status
__ On
__ Off
Suction readings access valve
PSIG
°F
SH
25-35 PSIG
20°F Min.
Superheat
Liquid readings at access valve
PSIG
°F
SC
105-180 PSIG
8-12°F Subcooling
Condensing unit power supply
Volts
Amps
103-127V
nameplate amps
odS Setting
Please provide the email address
to contact with the warranty
activation:
**REQUIRED** TO ACTIVATE THE WARRANTY.
INSTALLERS
MUST
FILL OUT THIS SHEET AND
FAX TO
707.794.8005
OR SCAN & EMAIL TO
Содержание 3000Scmr
Страница 1: ...V10 19 Control the Elements Split Ceiling Mount Refrigeration Systems Owner sManual...
Страница 2: ...V10 19 This page intentionally left blank...
Страница 7: ...7 V10 19 Evaporator Cut Sheets...
Страница 8: ...8 V10 19 Condensing Unit Cut Sheets...
Страница 13: ...13 V10 19 Evaporator Mounting Detail...
Страница 20: ...20 V10 19...
Страница 22: ...22 V10 19...
Страница 23: ...23 V10 19 6000Scm Wiring Diagrams Option A Dual Power Valve Control Page 1 of 2...
Страница 24: ...24 V10 19 6000Scm Wiring Diagrams Option A Dual Power Valve Control Page 2 of 2...
Страница 25: ...25 V10 19 8000Scm Wiring Diagrams Option A Dual Power Valve Control Page 1 of 2...
Страница 26: ...26 V10 19 8000Scm Wiring Diagrams Option A Dual Power Valve Control Page 2 of 2...
Страница 28: ...28 V10 19 3000 4000Scm Wiring Diagram Option B Single Power Electronic Control...
Страница 30: ...30 V10 19 6000Scm Wiring Diagram Option B Single Power Electronic Control Page 1 of 2...
Страница 31: ...31 V10 19 6000Scm Wiring Diagram Option B Single Power Electronic Control Page 2 of 2...
Страница 32: ...32 V10 19 8000Scm Wiring Diagram Option B Single Power Electronic Control Page 1 of 2...
Страница 33: ...33 V10 19 8000Scm Wiring Diagram Option B Single Power Electronic Control Page 2 of 2...