F
CONDENSING UNIT
55
°
F
BOTTLE PROBE
” suction line
” liquid line
” liquid line
18-5 THERMOSTAT
WIRE
DISPLAY CABLE
13*."3: EVAPORATOR UNIT
S&$0/%"3: EVAPORATOR UNIT
DISCHARGE LOCATION
DISCHARGE LOCATION
POWER CABLE
POWER CABLE
*5&.4503065&#&'03&*/45"--*/(5)&&7"103"5036/*54
Route the refrigerant lines from each evaporator unit toward each other using OD copper tubing for the suction line and 1⁄4” OD
tubing for the liquid lines.
Join both suction lines together using a T-fitting. Install a ” to reducer at the outlet of the T-fitting. The remainder of the
suctionline from the T-fitting to the condensing unit will need to be ” OD copper tubing.
Join both liquid lines together using a T-fitting. Install a to 1⁄4” reducer at the inlet of the T-fitting. The remainder of the
liquidlinefrom the T-fitting to the condensing unit will need to be OD copper tubing.
Route the display cable from the desired location to the desired QSJNBSZ evaporator unit installation location
Route the bottle probe cable from the desired thermostat bottle location to desired QSJNBSZ evaporator unit installation location
Route the drain lines from a proper discharge location to desired evaporator unit installation locations
Route the power cable wiring to the desired evaporator unit installation locations.
Route an 18-5 thermostat wire between the desired evaporator unit installation locations.
55
°
F
TVDUJPOMJOF
wTVDUJPOMJOF
20V 60Hz 1 PH 15-amp
dedicated circuit
POWER CABLE
7$0..6/*$"5*0/$"#-&
MJRVJEMJOF
Page 10
08/09/21
Содержание CM TWIN H.E.
Страница 29: ...58 8 3 3 5 Page 27 08 09 21...
Страница 30: ...58 8 3 3 7 Page 28 08 09 21...
Страница 31: ...0 4 6 5 8 3 3 Page 29 08 09 21...
Страница 61: ...CellarCool 1738 E Alpine Ave Stockton CA 95205 1 800 343 9463 www cellarcool com...