42
Step 15: Attach Hand Grip to Fort
A:
Measure 6” from the top of the floor boards on the right hand side of the Rock Board, pre-drill with a 1/8”
drill bit then attach 1 Hand Grip with 2 (WL3) 1/4 x 1-3/8” Wafer Lags to the Front Wall. (fig. 15.1, 15.2)
Other Parts
1 x Hand Grip
6”
Hardware
2 x
1/4 x 1-3/8” Wafer Lag
WL3
Fig. 15.1
WL3
Hand Grip
Fig. 15.2