1. 

HOPPERS

• To remove the hoppers raise the upper door
and lift out the hoppers.
• To reposition the hoppers in the
compartment, slide the hopper base back
between the rails until the ¼" pin at the
bottom of the hopper base falls into the ¼"
positioning hole of the compartment base
cover.

2.

RINSE SWITCHES

See diagrams on previous

pages for the location of rinse switches for each
individual model. 
• In the RINSE position the switches disengage
the hopper motors and allow only water to be
dispensed.
• They are used for flushing out the Whipper
Chambers and to adjust the water dispense
valves for proper flow rates.

3.

HEATER SWITCHES

See diagrams on previous

pages for the location of heater switches for
each individual model. 
• The switches primary function is to shut off
the heating  element during the initial priming,
start up  operation of the machine, or whenever
the tank is being drained for service.

Note: 

The Power and Heater Switches must both

be ON in order for the elements to operate.

4.

POWER SWITCHES

See diagrams on previous

pages for the location of power switches for
each individual model. 
• The power switches control all power to the
machine including the heater elements. 

Note:

The Power and Heater Switches are

independent of each other. Both switches must
be OFF in order for the machine to be
completely shut down.

5.

OUT OF PRODUCT SENSORS 

(OPTIONAL)

Activates the product-out indicating light,
calling for the hoppers to be checked and
refilled.

6.

WATER LEVEL CONTROLS:

Under normal

conditions and operation, the water level in the
tank should not drop more than ½" from the
probe. If it does, the tank is not refilling fast
enough. Check the water line and water filter;
they may need cleaning or replacing.
1. Tank Control Board

Part# 349-00012

2. Water Inlet Valve 

Part# L462AL

3. Water Level Sensor

Part# K695QL

Start-up Procedure

NOTICE: 

Make sure that the 

Heater Switches

, are

in the 

OFF 

position.

1. Level machine.
2. Connect the ¼" dia. copper waterline to the ¼"

flare water inlet fitting of the valve.

3. Plug the power cord(s) into a proper receptacle.

Note:

GB8M10 units use two power cords. Each  cord

must be plugged into a separate receptacle.

4. Activate the Power Switch(es) (Toggle Up). The

door display panel, the red power indicator
light and the green dispense buttons will light
up and the tank will start filling. Allow
approximately 4-5 minutes for the tank to fill.

5. Activate the Heater Switch(es). Allow

approximately 10-30 minutes for the water to
reach a temperature of 195°F. The heating time
will depend on the water inlet temperature, the
input voltage, and the wattage of the elements
in the machine.

6. Place a 6 oz. or larger cup under the left

dispense nozzle, press and hold the left
dispense switch for 6 seconds. The machine will
dispense water at the rate of 1 oz. per second.
Repeat it several times to check for consistent
output. Repeat same for the other dispense
switches. This procedure checks that the
dispense valves are not air-locked.

7. While the tank is heating, remove the hoppers,

load them with product, and reposition them
back in place. When the heater light turns off,
the water tank(s) has reached its proper
temperature and the machine is ready to
dispense the first cup of Cappuccino.

Filling the Hoppers

1. Open the upper door, and remove the hoppers.
2. Fill each hopper with the correct product. 
3. Reposition hoppers in the hopper

compartment, making sure the hoppers are
properly seated.

If you need help, call Grindmaster-Cecilware Technical
Service Department for help, (502) 425-4776 or (800)
695-4500 (USA & Canada only) 8 AM - 6 PM EST.

Prior authorization must be obtained from
Grindmaster-Cecilware for all warranty claims.

Installation (continued)

Содержание GB3M-10-LD-U

Страница 1: ...ide 11 Parts Diagram and List 12 Wiring Diagrams 19 Thank you for purchasing this quality powdered cappuccino dispenser For your safety and the safety of others read all warnings and the operator s ma...

Страница 2: ...lt grounded power cords To avoid any injury turn both power switches OFF Or unplug both power cords and allow unit to cool completely before performing any maintenance or cleaning The GB8M10 LD U requ...

Страница 3: ...rs will hold double the amount of your most popular avor along with up to seven other avors as well With these Dispensers you will not waste valuable time re lling product Hoppers or lose pro ts durin...

Страница 4: ...RW DWHU 7DQNV 3RZHU 6XSSOLHV DQV DUJH LVSOD RSHQLQJ 75 5 48 5 0 17 LVSHQVHU LV VXSSOLHG ZLWK 3RZHU 6XSSOLHV 5HTXLUHV Y PS GHGLFDWHG 2XWOHWV 7 5 211 7 21 DWHU SUHVVXUH WR 36 LVSHQVHU LV VXSSOLHG ZLWK...

Страница 5: ...hard water a water softener must be installed in order to prevent a malfunctioning of the equipment and in order not to void the warranty Electrical Connection PLUG CONFIGURATIONS The GB8 MODEL is sup...

Страница 6: ...ing or replacing 1 Tank Control Board Part 349 00012 2 Water Inlet Valve Part L462AL 3 Water Level Sensor Part K695QL Start up Procedure NOTICE Make sure that the Heater Switches are in the OFF positi...

Страница 7: ...eously will reset to default 195 F Display Decrease Increase 195 Operation 7 5 2 8670 17 63 16 9 9 Water Flow Rate Adjustment Adjust water flow rate to correct level in Whipping Chamber The Dispense V...

Страница 8: ...er into hoppers Install all hoppers into unit 2 Whipper chamber cleaning Remove dispense caps by turning and lifting Remove mixing bowls by lifting and pulling Remove product tubes by pulling down Twi...

Страница 9: ...picture inside metal door Recommended preventive maintenance 1 Dispense Valves Check all dispense valves for lime build up Drain the water tank to just below the level of the dispense valves Remove th...

Страница 10: ...ter Clean probe Water Inlet Valve Test 1 Turn power OFF If the water level rises inside a partially lled tank the Water Inlet Valve is leaking 2 Disconnect wires from the Water Inlet Valve coil and co...

Страница 11: ...needed replace components Hopper outlet clogged Clean Hopper and check Cartridge Heater Faulty Coupling Replace damaged Coupling components Water does not shut off Water keeps dispensing Leaking Water...

Страница 12: ...o Dispenser Vertical Door Parts Diagram and List Hopper Illustrations HOPPER ASS Y CD185L 5 LB 14 HIGH x 2 5 WIDE W WIRE AUGER PRODUCT GUIDE SHORT WIRE AUGER CD101L 22 5mm DIA 17mm PITCH AUGER BUSHING...

Страница 13: ...7 17 5 1 7 67 1 5 675 7 33 5 0 56 685 72 25 5 86 1 7 255 7 3 57 180 56 6 17 33 5 0 5 0 5 1 6 1 5 6 33 5 0 5 6 17 1 63 16 83 0 5 02817 5200 7 07 3 7 62 7 0 1 2 2 5 1 2 5 1 7 16 21 78 1 21 21 0 0 6 5 6...

Страница 14: ...enser Vertical Door Parts Diagram and List continued Body Frame Sub Assembly GB3M10 LD U and GB6M10 LD U Body Frame Sub Assembly GB8M10 LD U PARTS LIST DESCRIPTION ITEM QTY GB6 P N GB3 P N QTY PARTS L...

Страница 15: ...ppuccino Dispenser Vertical Door Cecilware 15 Parts Diagram and List continued Upper Door Lower Door PARTS LIST DESCRIPTION ITEM GB8 GB6 GB3 3 PARTS LIST DESCRIPTION ITEM GB6 GB8 GB3 3 3 3 3 0 0 0 0 0...

Страница 16: ...16 Cecilware Cappuccino Dispenser Vertical Door Parts Diagram and List continued Electrical Chassis and Control PARTS LIST DESCRIPTION ITEM QTY GB8 GB6 GB3...

Страница 17: ...TEM P N RL72C AND SM90C TANK DIMENSIONS 12 WIDE 4 8 DEEP 16 5 HIGH APPROX 3 7 GAL HOT WATER TANK RL72C R USED ON GB5 LD U GB8M 10 LD U RIGHT SIDE HOT WATER TANK SM90C L USED ON GB8M 10 LD U LEFT SIDE...

Страница 18: ...5 7 76 33 5 7 76 1 63 16 83 33 5 0 5 6 17 02817 1 6 6 02817 5200 7 0 1 2 62 7 6 7 66 0 7 5 9 63 16 6 7 5 1 63 16 9 9 5 16 6 7 7 1 21752 2 5 7 50 6725 352 2 5 1 6 21 6 PP 6 7 225 7 2 5 1 2 225 76 6 635...

Страница 19: ...ccino Dispenser Vertical Door Cecilware 19 Wiring Diagrams GB3M10 LD U 120V 1700W 1 PH 2 wires Ground w Relays WATER LEVEL PROBE GND WATER TANK WATER INLET VALVE P1 5 P3 P2 TRANSFORMER RELAY FILL L L...

Страница 20: ...20 Cecilware Cappuccino Dispenser Vertical Door Wiring Diagrams continued GB6M10 LD U WATER LEVEL PROBE GND WATER TANK WATER INLET VALVE P1 5 P3 P2 TRANSFORMER RELAY FILL L L L N N...

Страница 21: ...Dispenser Vertical Door Cecilware 21 Wiring Diagrams continued GB8M10 LD U with and without water option LEFT SIDE WATER LEVEL PROBE GND WATER TANK WATER INLET VALVE P1 5 P3 P2 TRANSFORMER RELAY FILL...

Страница 22: ...e Cappuccino Dispenser Vertical Door Wiring Diagrams continued GB8M10 LD U with and without water option RIGHT SIDE WATER LEVEL PROBE GND WATER TANK WATER INLET VALVE P1 5 P3 P2 TRANSFORMER RELAY FILL...

Страница 23: ...spenser Vertical Door Cecilware 23 Wiring Diagrams continued GB8M10WLD U with optional OUT OF PRODUCT Light LEFT SIDE WATER LEVEL PROBE GND WATER TANK WATER INLET VALVE P1 5 P3 P2 TRANSFORMER RELAY FI...

Страница 24: ...Cecilware 4003 Collins Lane Louisville KY 40245 USA Phone 502 425 4776 Toll Free 800 695 4500 Fax 502 425 4664 Web gmcw com Email info gmcw com 2017 Grindmaster Cecilware Printed in USA 1017 Form CW...

Отзывы: