Cecilware B-1/3 Скачать руководство пользователя страница 4

Installation

UNPACKING AND ASSEMBLY:

The machine is shipped with a set of (4) adjustable
leveling feet already mounted, (1) brew funnel, (1)
brew-thru cover, and (1) water inlet fitting and (1)
Operator Manual. 

1. Install unit on a level surface capable of supporting

the weight of the brewer and filled dispenser.

2. Level brewer by adjusting feet height.

WATER INLET CONNECTION:

NOTICE:

Installation to a water filter system is highly

recommended to prevent lime and scale build up in the
machine.

NOTICE:

In areas with extremely hard water, a water

softener must be installed in order to prevent a
malfunctioning of the equipment and in order not to
void the warranty. 

NOTICE:

Do not use a saddle valve to hook up the

brewer since most of them restrict the water flow
causing inconsistent brew batches.

This equipment must be installed to comply with the
applicable federal, state, or local plumbing codes
having jurisdiction.
In addition:
• A quick disconnect water connection or enough

extra coiled tubing (at least 2x the depth of the
unit) so that the machine can be moved for
cleaning underneath.

• An approved back flow prevention device, such as

a double check valve must be installed between the
machine and the water supply.

• For use of machine outside the United States of

America, connection to water supply mains should
comply with local codes and regulations.

The brewer must be connected to a cold water supply
with an operating pressure of 20psi minimum and
90psi maximum from a 1/2” supply line.

If pressure should exceed 90psi, install a pressure
regulator to reduce the operating pressure to 50psi.
Use 1/4” inch copper tubing for installation of less than
25 ft. and 3/8” copper tubing for more than 25 ft. from
a 1/2” cold water supply line.

1. The tea brewer is equipped with a 1/4" flare water

inlet fitting which is located in the back of the unit. 

2. Install the water inlet fitting provided onto the inlet

valve located in the back of the unit. Do not over-
tighten. 

3. Connect a 1/4" copper waterline to the 1/4" flare

water inlet fitting of the valve.

INITIAL SET-UP:

1. Make sure unit is disconnected from power source.
2.  Remove top cover and 

make sure that heater

switch is in the OFF position

. This will prevent

heater damage due to lack of water in the tank.

3.  Plug the brewer into a power source. Do not use

extension cord.

4.  Water will flow into the tank and will stop when

the tank is fully primed (4-5 minutes).

Note: This process is automatic and is controlled by the
Level Control Board and the Level Control Sensor,
which is plugged into the top of the Tank.

5.  Flip the Heater Toggle Switch to the ON position.

This activates the heater. Allow 15-20 min. heat up
time.

6.  Unplug the brewer and replace the top cover. 
7.  Re-connect the brewer and test run the unit by

going through a Brew Cycle. 

Note: The machine is equipped with a Low
Temperature Lockout system and will not brew until
the hot water tank is filled with water and has reached
the proper brew temperature of 197-203°F. 

8. Insert the Brew Funnel and position empty

Dispenser under it.

9. Go through one Brew cycle to make sure unit is

operating properly.

Note: To test the brew cycle with cold water, flip
Heater Switch to OFF position. This deactivates the
temperature lockout and allows speedier testing.

Operation

Tea Brewing Procedure.

The Brewers are Factory pre-set to deliver the correct
amount of hot water for best extraction of Hot Tea
Concentrate and Cold Water Dilution. See 

Flavor

Chart

. Different tea blends might require some

secondary adjustments of Hot and Cold water ratios in
order to achieve their desired flavor profiles. This is
easily accomplished by adjusting the Cold and Hot
Brew Timers located inside the top. See instructions
under 

Adjustments

(for qualified Service Personnel

only).

4

Cecilware

®

TB Series Iced Tea Brewer

CAUTION:

Operate with care. Tea Brewer

dispenses HOT WATER and HOT TEA that can cause
serious burns.

Содержание B-1/3

Страница 1: ...eration 4 Cleaning 5 Maintenance 6 Troubleshooting Guide 9 Parts Diagram and List 10 Wiring Diagram 14 Thank you for purchasing this quality tea brewer or dispenser For your safety and the safety of o...

Страница 2: ...Do not use near combustibles Use only on a circuit load that is properly protected and capable of the rated load Always unplug unit from power supply before servicing or cleaning If the main power su...

Страница 3: ...trical TB3 Brewer with B1 3T Dispenser Tea Brewer with Dispenser 3 gallon capacity C UL US NSF Certification 1 4 water line required 120V 1 8 kW 15A 1 Ph Line cord included NEMA plug 5 15P B1 3 Dispen...

Страница 4: ...all the water inlet fitting provided onto the inlet valve located in the back of the unit Do not over tighten 3 Connect a 1 4 copper waterline to the 1 4 flare water inlet fitting of the valve INITIAL...

Страница 5: ...g Carefully inspect washers Replace any damaged parts 2 Place brew funnel cover drip tray cover and faucet components into a warm soapy wash 3 Clean all components by brushing or scrubbing Use a bottl...

Страница 6: ...TEA and then adjust the Timer to 3 to 5 min depending on the water pressure in the main water line COLD WATER DILUTION DELAY TIMER ADJUSTMENT located inside the unit near the water inlet valve Set De...

Страница 7: ...reading and repeat if necessary To DECREASE the water temperature simply turn the Thermostat Knob one notch counterclockwise CCW to the next lower dial setting CRITICAL COMPONENTS TESTS A Water Inlet...

Страница 8: ...e Water Level Control Board Test Check the board as follows 1 Make sure there is power input to the board at the terminals 2 3 Your voltmeter should read 115 Volts It should read the same at terminals...

Страница 9: ...if necessary at all or no water is coming See Water Inlet Valve Test from dilution nozzle Hi Level Float Switch malfunction Test High Level Float Switch Replace if necessary Probe malfunction Check P...

Страница 10: ...authorization must be obtained from Grindmaster Cecilware for all warranty claims Grindmaster Cecilware provides the industry s BEST warranty Visit our website at GMCW com for warranty terms and condi...

Страница 11: ...LACK COVER MOLDED 3 GAL OCTAGON BASE M028AL P264A M776AL Q181AL 3 GAL M632AL 2 P015AL 2 D064EL 355 00025 19015L 2 359 00092 RT31AL RT33QL CECILWARE CHROME LABEL 380 00061 PINCH FAUCET D084AL M776QL CO...

Страница 12: ...RV33QL HOSE WATER INLET 24 M326AL 6 WATER INLET VALVE CD241L QTY 5 6 15 DUAL LEVEL CONTROL BOARD 17 RELAY TEMPERATURE LOCK OUT L539AL TEA BREWER TB 3 16 17 OVERFLOW HOSE M545AL 18 BREW HOSE M326AL CEC...

Страница 13: ...TB Series Iced Tea Brewer Cecilware 13 Parts Diagram and List continued HOT WATER TANK Part No RV33C 2 0 Gal 2 4 5 6 8 7 1 10 9 12 3 11...

Страница 14: ...14 Cecilware TB Series Iced Tea Brewer Wiring Diagram...

Страница 15: ...TB Series Iced Tea Brewer Cecilware 15...

Страница 16: ...lware 4003 Collins Lane Louisville KY 40245 USA Phone 502 425 4776 Toll Free 800 695 4500 Fax 502 425 4664 Web gmcw com Email info gmcw com 2008 Grindmaster Cecilware Printed in USA 0915 Form CW 313 0...

Отзывы: