The I-210 is a PLC, a module which you can set a full schedule operation for each output. The circuit
also thanks to its programming step by step, we will set up a flexible graphical performance. They usually present needs
work on different devices, on which asynchronous operation is required and complex. Hard work applicable patterns with
simple timers. These devices typically require such cycles capricious eg, 4 sec. connection, immediately after 8 sec. off,
after which 7 sec. of connection, then again 12 sec. disconnect, etc. These "Guidelines for Operation" can be easily
programmed through the I-210. The module, however, instead of having a standard measure by which to make the graph,
for example, sec., as ilustrábamos above, the circuit employs "steps", this being its smallest measure. Describe later how
to assign a measure of real time to the division step. The graph is made by grouping steps. Returning to the example
above, the circuit should be scheduled first grouping step 0 to 4, which will be configured "connection" in step 4 to 12 in
the "disengagement" from 12 to 22 in "connection", and finally from 22 to 34 in disconnection. Finally, assigned as a
measure of time per step, 1 sec. See Fig. 1
Figure 1 - Sample performance graph
Common Graphic
Graph in step
Sequence 1
Sequence 2
Sequence 3
Sequence 4
Programming the I-210 is similar to that used in home videos. Using the buttons and display panel embodying the control
module will perform all functions. See Fig 2. Power feeding module. The display will briefly describe the module, and
following her visualize the data shown in Fig. 2.
Figure 2 - Front view of the control lever of I-210.
Working screen
Display screen
Up key
Key Down
Among key
Key relay 1
Key relay 2 Pause key