background image

CE -225 Mesh Conveyor Heat Tunnel Packaging Machine 

 

 

 

 

  

 

 

Page 

4

 

V.  Instructions for Operation 

 

1.  

Place the machine on a level surface and remove the outer package. 

2.  

F

or  the  operator’s  personal  safety,  the  machine  must  be  grounded 

according  to  the  regulations  before  use  and  ensure  that  the  contact  is 
good (good grounding can reduce the electric shock damage to the human 
body when a single-phase ground fault occurs in the electrical appliance.) 
Connect  to  the  power  supply  according  to  the  power  supply  voltage 
specified on the machine label. 

 

 

3. 

Close  the  power  switch,  turn  on  the  heating  switch,  and  set  the 
temperature of the thermostat to about 170 °C. 

 

Содержание CE-225

Страница 1: ...866 888 6327 sales clevelandequipment com 3889 E Raines Rd Memphis TN 38118 www clevelandequipment com CE 225 Mesh Conveyor Heat Tunnel Operation Manual...

Страница 2: ...Packaging Machine Contents I Foreword 1 II Function 1 III Technical Parameters 2 IV Panel 3 V Instructions for Operation 4 VI Electrical Diagram 7 VII Component Diagram 9 VIII Troubleshooting 12 IX S...

Страница 3: ...od is a popular and economical packaging method in the packing industry There is an increasing demand for its economical simple packing and aesthetically pleasing appearance The product is wrapped wit...

Страница 4: ...2 III Technical Parameters Voltage 220V 50 60Hz Power 7 65 Kw Speed 0 10 m min Tunnel Size 800x400x200 mm 31 5 x 15 75 x 7 9 in Load 5Kg 11 lbs Machine size Low 1060x620x815 mm 41 75 x 24 5 x 32 in Ma...

Страница 5: ...of Heating Pipe 3 Conveying Adjustment Adjust speed of conveying motor 4 Conveying Switch Controlling switch of conveying belt motor 5 Heating Switch Switch for controlling heating tube in shrinkage...

Страница 6: ...according to the regulations before use and ensure that the contact is good good grounding can reduce the electric shock damage to the human body when a single phase ground fault occurs in the electr...

Страница 7: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 5 4 Adjust the heating adjustment know to the appropriate position according to the shrinkage rate of the film...

Страница 8: ...conveyor switch and adjust the conveyor know to adjust the conveyor speed to the appropriate gear position 6 After the above operation is completed let the machine run preheat for 5 10 minutes then o...

Страница 9: ...e temperature and speed are mutually restrained it may be necessary to repeat the adjustment several times to meet the requirements 8 After the packaging is finished the heating switch should be turne...

Страница 10: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 8 VI Electrical Diagram...

Страница 11: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 9 VII Component Diagram...

Страница 12: ...10 6 Curtain vertical bead 4 1 5 Q235 7 Curtain horizontal strip 2 1 5 Q235 8 Thermal insulation board 2 Group Weldment 9 Upper Liner 1 1 0 Galvanized Sheet 10 Frame 1 Group Weldment 11 Stainless Stee...

Страница 13: ...servation Window Partition 1 Group Weldment 26 Observation Window Platform 1 Group Weldment 27 Observation Window Partition 1 Group Weldment 28 Guide Assembly 2 29 Furnace Shield 1 1 0 Galvanized Shee...

Страница 14: ...mperature of Tunnel is Low Some heating pipes broken Replace Heat adjustment is too low Increase Temperature is set too low Reset One of the 3 fire wires is loose Re Connect Conveyor Motor Stops Runni...

Страница 15: ...at Tunnel Packaging Machine Page 13 IX Shrink Film Temperature Guide Name Thickness mm Heating Time S Temperature C PVC 0 02 0 06 5 10 110 130 PP 0 02 0 04 6 12 130 170 PE 0 06 0 20 10 60 150 180 POF...