![CDA ECNK90 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/cda/ecnk90/ecnk90_installation-use-and-maintenance-manual_2576557016.webp)
16
be at least the minimum height specified). Connect the mounting
frame at the required height as per Figs. 10 and 11.
5. Place the chimney sections over the body assembly, as shown in fig
8.
6. With the help of another individual, raise the whole assembly to the
ceiling and fix securely in place using four screws appropriate for
the wall plugs inserted in step 2. Ensure that the supporting ceiling
is strong enough to take the weight before releasing the extractor.
7. Connect the ducting to the extractor vent outlet, securing it in place
with a worm-drive hose clamp (jubilee clip).
8. Finally, raise the inner section of the chimney to the ceiling and
secure in place using the two small screws supplied
9. Note that the electrical connection to the extractor must not be
located inside the boundaries of the chimney. There must be an
isolation switch so that the extractor can be disconnected from the
mains electrical supply after installation.
Содержание ECNK90
Страница 1: ...www cda eu ECNK90 Island Extractor Installation use and maintenance...
Страница 17: ...17 815 1020mm 735 1020mm Fig 10 Fig 11...
Страница 18: ...18 NOTES...