![CDA ECNK90 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/cda/ecnk90/ecnk90_installation-use-and-maintenance-manual_2576557014.webp)
14
Installation
Note
• We recommend that you seek the
help of another individual when
installing this product. Always wear
adequate PPE (Personal Protective
Equipment).
• The fixings supplied are suitable
for most installations. It is the
responsibility of the installer to
ensure that the fixings are suitable
for the ceiling type in the property.
Installation steps
1. Firstly, fix the vent outlet to the
extractor body using four screws, as
shown in fig 5.
2. Using the supplied template, mark
the positions of the ceiling mounting
screws and the cut-out for the
ducting pipe, if required.
Fix four suitable wall plugs into the
holes and proceed to assemble the
extractor, as per fig 6.
3. To determine the overall height
B - clearance required
Gas: 750mm recommended.
Electric: 650mm recommended.
A - burner height
Extractor height
floor
ceiling
Fig. 6
Fig. 5
Fig. 4
Содержание ECNK90
Страница 1: ...www cda eu ECNK90 Island Extractor Installation use and maintenance...
Страница 17: ...17 815 1020mm 735 1020mm Fig 10 Fig 11...
Страница 18: ...18 NOTES...