13
4. Attach the lower fixing brackets
to the wall using large screws
in the lower two holes drilled
in the wall; note the correct
orientation of these brackets is
shown in fig. 6.
5. Only tighten the screws in
these lower fixing brackets
enough to hold the brackets to
the wall but still allow them to
be slid into their final position.
6. Lift the extractor body into
position and hang it with the
key-hole slots in the upper
hanging brackets over the
upper wall screws.
7. Insert screws through the
lower fixing brackets to secure
the extractor body to them
(lower left one shown in Fig. 7).
8. Mount the cover into position over the main body, ensuring that the
plug on the end of the trailing lead is plugged into the socket on
the front of the body unit (Fig. 8). Insert two screws into the holes
in the top face to secure the cover in position.
Fig. 7
Fig. 6
Fig. 8