250 Rebagger Auger Packer 2014
8
OF
10
CHAPTER 2
MAINTENANCE
Periodically check the belt tension and adjust as required. (SEE BELOW) using all threaded bolts.
Страница 1: ...250 Rebagger Auger Packer 2014 1 OF 10 Model 250 Rebagger Packer Safety Installation Operation Maintenance TABLE OF CONMTENT ...
Страница 2: ...uger Packer 2014 2 OF 10 WARNINGS 6 BEFORE OPERATING EQUIPMENT 6 WHEN OPERATING EQUIPMENT 6 QUICK REFERENCE CHAPTER 1 OPERATION 9 CHAPTER 2 MAINTENANCE 11 ILLUSTRATED PARTS FOR CBE MODEL 250 REBAGGERSERIES PACKER 14 ...
Страница 3: ... Street TX 76574 4936 Phone 512 352 3694 Fax 512 352 3648 Email parts service choicebagging com INFO choicebagging com Website www CHOICEBAGGING com IMPORTANT NOTICE READ THIS MANUAL COMPLETELY before installing starting up or operating this equipment Be certain all personnel concerned with this machinery are fully alerted to the possible HAZARDS of the equipment and its utilities electrical and p...
Страница 4: ... observe all warning signs 6 Check oil level in all motors 7 Be sure electrical equipment is free of any accumulation of water 8 Be sure all personnel are clear of operating mechanisms before connecting air 9 Never start equipment without first checking for loose objects tools and trash All persons in the immediate area of the equipment should be alerted prior to starting WHENOPERATINGEQUIPMENT 1 ...
Страница 5: ... systems are dangerous Do not service or troubleshoot systems with air supply on Be sure to bleed off any trapped air before working on components since it is possible to have high pressures trapped in airlines and cylinders etc 9 Keep fingers hands feet etc out of path of pneumatically operated components 10 Safety glasses should be worn in equipment area 11 Follow the safety regulations for your...
Страница 6: ...250 Rebagger Auger Packer 2014 6 OF 10 CHAPTER 1 OPERATION ...
Страница 7: ...rocess starting the auger The auger continues to run until the operator sees that the hopper is totally empty Operator releases the bag clamp which stops the filling process The operator removes bag from fill spout NOTE This machine does not have a scale therefore the weight is determined strictly by time an amount of material put in hopper at the beginning WARNING NEVER REMOVE INSIDE GRATE WORK W...
Страница 8: ...250 Rebagger Auger Packer 2014 8 OF 10 CHAPTER 2 MAINTENANCE Periodically check the belt tension and adjust as required SEE BELOW using all threaded bolts ...
Страница 9: ...ou should be able to press the belt in approximately 1 2 for proper adjustment Bag Clamp Adjust the bag clamp tip by loosening 3 8 jam nut and screwing the bag clamp tip up or down and retightening nut for proper adjustment from wear Lubrication periodically grease bearings 1 or 2 shots NOTE Make sure motor plate is raised evenly by measuring and maintaining the same distance on each corner ...
Страница 10: ...250 Rebagger Auger Packer 2014 10 OF 10 ILLUSTRATED PARTS See attached parts pages specific To your Equipment ...