![CBE 250 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/cbe/250/250_safety-installation-and-maintenance-instructions_2575510007.webp)
250 Rebagger Auger Packer 2014
7
OF
10
Operator dumps a broken bag into the packer hopper. Operator places
empty valve bag on fill spout. Operator pulls the manual bag clamp down to
clamp the bag to fill spout and at the same time starts the filling process
starting the auger.
The auger continues to run until the operator sees that the hopper is totally
empty. Operator releases the bag clamp, which stops the filling process.
The operator removes bag from fill spout.
NOTE: This machine does not have a scale therefore the weight is
determined strictly by time an amount of material put in hopper at the
beginning.
WARNING: NEVER REMOVE INSIDE GRATE WORK WITH POWER ON
AND OR OPERATE MACHINE WITH GRATE OUT.