EN-6
steady to screw the lower hinge plate
⑤
with the left bottom door frame.
[Figure 4] Door reversing is finished.
Operation
Start operation
1. Cleaning the compartment
Before power on, clean inside of the appliance and check the drainage pipe in good
connection.
(
For details, please refer to the
“Maintenance and cleaning”
)
2. Placement
Before powering on, level the appliance on the firm & dry floor for at least 30 minutes.
3. Power on
The appliance start operation and it will cool down inside after 1 hour, otherwise you
should check the power connection.
Control panel
All keys would be invalid in lock mode. Please unlock first.
ON/OFF
1. Keep pressing the key 3 seconds, power down, goes to stand-by mode.
2.Keep pressing the key again 3 seconds to return back to normal working.
Light
Press the key, turn on or turn off the LED lights inside. In stand-by mode, the
key is invalid.
UP
Press the key once, LED Display in regular flash showing current set
temperature. Continue pressing to adjust set temperature, one press increase
1
℃
. Regular flash quit after 5 seconds detecting no press and new set
temperature save. LED display return to show actual temperature inside.
Down