7- Loosen (don't take off)the screws P which will fix the
parts B and C (parts in form of an L) on horizontal bar.
8- Keep the "down-stop"
(part D) in the direction of the
lenght of the horizontal bar and bring up (by hand) the hammer
support and hammer (the hammer is similar to a long wedge).
Make them penetrate into the wedge distributor until the
hammer support comes up higher than the down stop (Part D ) .
Now turn the down stop
(part D)
into a 90° position to
horizontal bar so that hammer support remains sitting on the
part D.
9- Tighten
the
screw of
the
Part D
(down-stop)
(Allen
wrench no 5,
in accessory box),
and let the hammer support
sitting on it.
10-
Fix
the
start-of-travel
switch
(Part
C)
with
the
screws
P paying attention that
the
button of
the
switch
is
upside (like in drawing FIG 1.1).
11- Now, to fix the part B (in form of an "L") you need
to bring up the whole mechanism. For this, push up the whole
mechanism
from
the
buttom
of
the
stapling
cylinder
(air
piston);
bring up the mechanism until the part E
(start of
travel
stop,
in form of
)
comes up higher than the
screws where the part B will be fixed.
12- Fix the part B to the screws and tighten the screws.
Now the part E should be resting on part B.
The horizontal bracket
(Part E on drawing FIG 1)
should
be now in upper position.
Put
back
the
side
(grey)
casings
of
the
machine
and
connect the machine
to both
an
air
and
power supply.
Follow the Operation instructions of the Manual so to set
up, to adjust and to make your first joinings tests.
CASSESE DOCUMENT