E-31
User Maintenance
Eng
lish
To replace the lamp
z
When replacing the lamp, use the special screwdriver that comes with the replacement
lamp. The projector does not come with a screwdriver.
1.
Turn off the projector and unplug its AC
power cord.
2.
Wait for about 60 minutes to allow the
projector’s current lamp to cool down
completely.
3.
Turn over the projector and place it on
top of a desk or on some other stable
surface.
4.
Loosen the lamp cover screw, and then
remove the lamp cover.
5.
Loosen the three screws indicated by
an
mark.
6.
Pull up on the handle or ribbon to
remove the lamp cartridge.
Lamp cover
Lamp cartridge