6 - MAINTENANCE
Bleed
Replace
Grease
Check
Drain
Clean
Interval
Page
no.
Maintenance Action
No.
of
pts.
6-10
Swing reduction gear
1
X
6-39
Suction filter (Note W)
1
X
6-39
Return circuit filter (Note N-P-W)
1
X
6-39
Pilot filter (Note N-W)
1
X
Every 2000 hours
6-73
Air conditioning
1
X
6-39
Main pump output hydraulic hoses (Note Q)
—
X
Every 4000 hours
6-39
Boom, dipper and bucket cylinder hydraulic hoses (Note Q)
—
X
Every 4500 hours
6-76
Diesel Particulate Diffuser
(DPD)
(Note M)
1
X
6-39
Inlet filter (Note W)
1
X
Every 5000 hours
6-39
Hydraulic fluid (Note R-W)
1
X
3-78
Safety valves on the attachment cylinders (Note S)
3
X
-
Safety valves on the dozer blade cylinders (standard
machine only) (Note S)
2
X
6-30
Fuel pre-filter (Note T)
1
X
6-30
Fuel filter (Note T)
1
X
6-30
Fuel supply pump filter (Note U)
1
X
6-56
Tracks (Note U)
2
X
X
6-64
Fuel tank filter (Note U)
1
X
6-64
Fire extinguisher (Note V)
1
X
6-66
Machine settings (Note S)
—
X
X
6-66
Machine inspection (Note U)
—
X
X
As required
6-67
Cylinders for leaks (Note U)
—
X
Note A: Check every week and whenever installing the quick coupler.
Note B: To be checked every 6 months by a specialist.
Note C: If all these linkage points are not equipped with genuine parts, these points must be greased every 10 hours.
Note D: Or every 6 months.
Note E: Or when the message "Air filter" is shown on the message screens.
Note F: Check after the first 50 hours during the run-in period.
Note G: If all these linkage points are not equipped with genuine parts, these points must be greased every 50 hours.
Note H: Or every two years or twice a year (autumn/spring) if antifreeze is used.
Note J: Or after cleaning 6 times.
Note K: Or after the primary filter has been cleaned 3 times.
Note L: Drain after the first 250 hours during the run-in period.
Note M: Ask your CASE CONSTRUCTION Dealer to check this.
Note N: Replace after the first 250 hours during the run-in period.
Note P: If biodegradable fluid is used, it is imperative for the servicing interval to be reduced to 1000 hours.
Note Q: Or every 2 years, whichever comes first.
6-88
Содержание CX145C SR
Страница 6: ......
Страница 18: ...1 GENERAL INFORMATION 1 12 ...
Страница 28: ...2 SAFETY INFORMATION 50C06B9B 3 See chapter Illustration of decals for the functions of decals 2 10 ...
Страница 29: ...2 SAFETY INFORMATION E5054225_TU 4 2 11 ...
Страница 69: ...3 CONTROLS INSTRUMENTS System display and function control panel MUC8LU 034Z 1 MUC8LU 044Z 2 3 19 ...
Страница 132: ...3 CONTROLS INSTRUMENTS 3 82 ...
Страница 160: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 28 ...
Страница 180: ...4 OPERATING INSTRUCTIONS 4 48 ...
Страница 206: ...6 MAINTENANCE Offset boom pin 10 07C803C9 17 6 16 ...
Страница 207: ...6 MAINTENANCE Arm backhoe bucket 375EFD72 18 AB1F527A 19 6 17 ...
Страница 294: ...8 SPECIFICATIONS Working range with monobloc boom 2917308C 4 See next page for the values 8 10 ...
Страница 296: ...8 SPECIFICATIONS Working range with offset boom Offset zero 4F6C0DD8 5 See next page for the values 8 12 ...
Страница 298: ...8 SPECIFICATIONS Offset maximum left EACB5F36 6 See next page for the value 8 14 ...
Страница 300: ...8 SPECIFICATIONS 8 16 ...