![cascade corporation 55H Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/cascade-corporation/55h/55h_installation-manual_2567173007.webp)
6039153 Rev. 0
5
NSTALLATION
I
Prepare hoses
A
Determine hose lengths required for
hydraulic supply configuration of truck.
B
Cut hoses to length and install end fittings
or quick-disconnect kits.
6
INTERNAL HOSE REEVING
HOSE REELS
Sideshift Right
Sideshift Left
FP0604.ill
Sideshift Right
Sideshift Left
7
Flush hydraulic supply hoses
A
Install hoses to hose terminals on carriage.
Connect together using union fittings.
B
Operate auxiliary valves for 30 sec.
C
Remove union fittings.
GA0092.ill
Back (Driver's) View
FP0602.ill
Close Forks
Spread Forks
Close Forks
Spread Forks