
12
Fig. 9 — Rigging Details
Step 7 — Convert to Horizontal and Connect
Ductwork (when required)
Unit is shipped in the vertical duct configuration. Unit without
factory-installed economizer or return-air smoke detector option
may be field-converted to horizontal ducted configuration. To
convert to horizontal configuration, remove screws from side duct
opening covers (see Fig. 10) and remove covers. Use the screws to
install the covers on vertical duct openings with the insulation-side
down. The panels must be inserted into the notches on the basepan
to properly seal. The notches are covered by the tape used to
secure the insulation to the basepan and are not easily seen. See
Fig. 11 for position of the notches in the basepan. Seals around
duct openings must be tight. Secure with screws as shown in
Fig. 12. Cover seams with foil duct tape.
Field-supplied flanges should be attached to horizontal duct open-
ings and all ductwork should be secured to the flanges. Insulate
and weatherproof all external ductwork, joints, and roof or build-
ing openings with counter flashing and mastic in accordance with
applicable codes.
Do not cover or obscure visibility to the unit’s informative data
plate when insulating horizontal ductwork.
Fig. 10 — Horizontal Conversion Panels
Fig. 11 — Location of Notches
DETAIL "A"
PLACE ALL SEAL STRIP IN PLACE
BEFORE PLACING UNIT ON ROOF CURB.
DUCT END
SEE DETAIL "A"
"A"
(914-1371)
36"- 54"
"C"
"B"
SPREADER
BARS
REQUIRED
NOTES:
1. SPREADER BARS REQUIRED — Top damage will occur if spreader
b
ars are not used.
2. Dimensions in ( ) are in millimeters.
3. Hook rigging shackles through holes in
b
ase rail, as shown in detail “A.” Holes in
b
ase rails are centered around the unit center of
gravity. Use wooden top to prevent rigging straps from damaging unit.
UNIT
MAX WEIGHT
DIMENSIONS
A
B
C
lb
kg
in.
mm
in.
mm
in.
mm
50HCQA04
725
330
74.5
1
8
90
4
8
.5
9
8
0
33.5
8
50
50HCQA05
8
45
3
8
4
74.5
1
8
90
37.5
955
41.5
1055
50HCQA06
900
409
74.5
1
8
90
37.5
955
41.5
1055
REMOVABLE HORIZONTAL
SUPPLY DUCT OPENING COVER
REMOVABLE HORIZONTAL
RETURN DUCT OPENING COVER
BASEPAN
NOTCHES
NOTCHES
Содержание WeatherMaster 50HCQ 04 Series
Страница 4: ...4 Fig 2 50HCQ 04 06 Units Built On and After 4 15 2019 ...
Страница 5: ...5 Fig 3 50HCQ 04 06 Units Built Prior to 4 15 2019 ...
Страница 6: ...6 Fig 4 50HCQ 04 06 Corner Weights and Clearances ...
Страница 7: ...7 Fig 5 50HCQ 04 06 Base Rail Details ...
Страница 8: ...8 Fig 6 50HCQ 04 06 Thru the Base Charts ...
Страница 23: ...23 Fig 41 Electro Mechanical Control Wiring 208 230v 460v ...
Страница 24: ...24 Fig 42 Electro Mechanical Control Wiring 575v ...
Страница 25: ...25 Fig 43 Electro Mechanical Power Wiring 208 230 1 60 ...
Страница 26: ...26 Fig 44 Electro Mechanical Power Wiring 208 230 3 60 ...
Страница 27: ...27 Fig 45 Electro Mechanical Power Wiring 460 3 60 ...
Страница 28: ...28 Fig 46 Electro Mechanical Power Wiring 575 3 60 ...
Страница 29: ...29 Fig 47 PremierLink Wiring Schematic 208 230 460v ...
Страница 30: ...30 Fig 48 PremierLink Wiring Schematic 575v ...
Страница 31: ...31 Fig 49 RTU Open System Control Wiring ...