or spaces freely communicating with the outdoors. Combustion
and ventilation openings must be sized the same as for a confined
space as defined below. Return air must not be taken from the
room unless an equal or greater amount of air is supplied to the
room.

CONFINED SPACE

A confined space is defined as a space whose volume is less than
50 cu ft per 1000 Btuh of total input ratings of all appliances
installed in that space. A confined space MUST have provisions
for supplying air for combustion, ventilation, and dilution of flue
gases using 1 of the following methods. (See Fig. 3, 4, and Table
2.)

NOTE:

In determining free area of an opening, the blocking

effect of louvers, grilles, and screens must be considered. If free
area of louver or grille design is unknown, assume that wood
louvers have a 20 percent free area and metal louvers or grilles
have a 60 percent free area. Screens, when used, must not be
smaller than 1/4-in. mesh. Louvers and grilles must be constructed
so they cannot be closed.

The size of the openings depends upon whether air comes from
outside of the structure or an unconfined space inside the structure.

1. All air from inside the structure requires 2 openings (for

structures not usually tight):

a. Each opening MUST have at least 1 sq in. of free area per

1000 Btuh of total input for all equipment within the
confined space, but not less than 100 sq in. per opening.
(See Fig. 3 and Table 2.) The minimum dimension of air
openings shall not be less than 3 in.

b. If building is constructed unusually tight, a permanent

opening directly communicating with the outdoors shall be
provided. See item 2 below.

c. If furnace is installed on a raised platform to provide a

return-air plenum, and return air is taken directly from
hallway or space adjacent to furnace, all air for combustion
must come from outdoors.

2. Air from outside the structure requires 1 of the following

methods:

a. If combustion air is taken from outdoors through 2 vertical

ducts, the openings and ducts MUST have at least 1 sq in.
of free area per 4000 Btuh of total input for all equipment
within the confined space. (See Fig. 4 and Table 2.)

b. If combustion air is taken from outdoors through 2 hori-

zontal ducts, the openings and ducts MUST have at least 1
sq in. of free area per 2000 Btuh of total input for all
equipment within the confined space. (See Fig. 4 and Table
2.)

c. If combustion air is taken from outdoors through a single

opening or duct (horizontal or vertical) commencing within
12 in. of the top of the confined space, opening and duct
MUST have at least 1 sq in. of free area per 3000 Btuh of
the total input for all equipment within the confined space
and not less than the sum of the areas of all vent connectors
in the confined space. (See Fig. 4 and Table 2.) Equipment

clearances to the structure shall be at least 1 in. from the
sides and back and 6 in. from the front of the appliances.

When ducts are used, they must be of the same cross-sectional area
as the free area of the openings to which they connect. The
minimum dimension of ducts must not be less than 3 in. (See Fig.
4.)

AIR DUCTS

Step 1—General Requirements

The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA) or
American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE). Or consult factory The Air Systems Design
Guidelines 
reference tables available from your local distributor.
The duct system should be sized to handle the required system
design airflow CFM at the design external static pressure.

When a furnace is installed so that the supply ducts carry air to
areas outside the space containing the furnace, the return air must
also be handled by a duct(s) sealed to the furnace casing and
terminating outside the space containing the furnace.

Secure ductwork with proper fasteners for type of ductwork used.
Seal supply- and return-duct connections to furnace with code
approved tape or duct sealer.

Flexible connections should be used between ductwork and
furnace to prevent transmission of vibration. Ductwork passing
through unconditioned space should be insulated to enhance
system performance. When air conditioning is used, a vapor
barrier is recommended.

Maintain a 1-in. clearance from combustible materials to supply air
ductwork for a distance of 36 in. horizontally from the furnace. See
NFPA 90B or local code for further requirements.

Step 2—Ductwork acoustical treatment

Metal duct systems that do not have a 90 degree elbow and 10 ft
of main duct to the first branch take-off may require internal
acoustical lining. As an alternative, fibrous ductwork may be used
if constructed and installed in accordance with the latest edition of
SMACNA construction standard on fibrous glass ducts. Both
acoustical lining and fibrous ductwork shall comply with NFPA
90B as tested by UL Standard 181 for Class 1 Rigid air ducts.

Step 3—Supply Air Connections

Connect supply-air duct to 3/4-in. flange on furnace supply-air
outlet. The supply-air duct attachment must ONLY be connected
to furnace supply-/outlet-air duct flanges or air conditioning coil
casing (when used). DO NOT cut main furnace casing to attach
supply side air duct, humidifier, or other accessories. All accesso-
ries MUST be connected external to furnace main casing.

Step 4—Return Air Connections

For airflow requirements above 1800 CFM, see Air Delivery
table in Product Data literature for specific use of single side
inlets. The use of both side inlets, a combination of 1 side and
the bottom, or the bottom only will ensure adequate return air
openings for airflow requireemnts above 1800 CFM.

The return-air duct must be connected to bottom , sides (left or
right), or a combination of bottom and side(s) of main furnace
casing as shown in Fig. 1. Bypass humidifier may be attached into
unused side return air portion of the furnace casing. DO NOT
connect any portion of return-air duct to back of furnace casing.

For Example:

58YAV FURNACE

INPUT BTUH

MINIMUM SQ FT WITH

7-1/2 FT CEILING

66,000

440

88,000

587

110,000

733

132,000

880

154,000

1027

5

Содержание WeatherMaker 8000 58YAV

Страница 1: ...he unit and other safety precautions that may apply Follow all safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA 54 1999 ANSI Z223 1 1999 and the...

Страница 2: ...ough 5 before bringing the control or yourself into contact with the furnace Put all used AND new controls into containers before touching ungrounded objects 7 An ESD service kit available from commer...

Страница 3: ...changing residential construction practices We require these instructions as a minimum for a safe installation Application of this furnace should be indoors with special attention given to vent sizin...

Страница 4: ...allel with or on the downstream side of the unit to avoid condensation in the heat exchangers When installed parallel with a furnace dampers or other means used to control the flow of air must prevent...

Страница 5: ...ch they connect The minimum dimension of ducts must not be less than 3 in See Fig 4 AIR DUCTS Step 1 General Requirements The duct system should be designed and sized according to accepted national st...

Страница 6: ...HROUGH ROOF 1 SQ IN PER 1000 BTUH IN DOOR OR WALL 12 MAX 1 SQ IN PER 1000 BTUH IN DOOR OR WALL 12 MAX INTERIOR HEATED SPACE Minimum opening size is 100 sq in with minimum dimensions of 3 in Minimum of...

Страница 7: ...lt should not exceed 1 1 2 in 1 Lay furnace on its back Locate and drill 5 16 in diameter hole in each bottom corner of furnace as shown in Fig 7 2 Install nut on bolt and install bolt and nut in hole...

Страница 8: ...shutoff valve Piping should be pressure tested in accordance with local and national plumbing and gas codes before the furnace has been attached If the furnace has been attached it is recommended tha...

Страница 9: ...use ONLY a 3 amp fuse of identical size ACCESSORIES 1 Electronic Air Cleaner EAC Two quick connect terminals marked EAC 1 and EAC 2 are provided for EAC connection See Fig 10 These terminals are ener...

Страница 10: ...polarity must be maintained for correct operation Thermostat wire connections at R W COM 24V and Y must be made at the 24 v terminal block on the control board The gas service pressure must not exceed...

Страница 11: ...C CONDUCTOR ON PCB FIELD WIRING TERMINAL FIELD GROUND EQUIPMENT GROUND FIELD SPLICE PLUG RECEPTACLE L1 L2 L1 BLWR HI LO TO 115VAC FIELD DISCONNECT NOTE 4 EQUIPMENT GROUND SPARE 2 HEAT SPARE 1 COOL NOT...

Страница 12: ...reverts to continuous operation after the heating cycle is completed When the thermostat calls for cooling the blower operates on cooling speed When the thermostat is satisfied the blower operates on...

Страница 13: ...cteristics b Adjust manifold pressure to obtain input rate 1 Remove regulator adjustment seal cap See Fig 12 2 Turn adjusting screw counterclockwise out to de crease manifold pressure or clockwise in...

Страница 14: ...3 3 0 43 3 1 43 3 2 43 3 3 Altitudes 950 43 2 7 43 2 8 43 2 9 43 3 0 43 3 1 2000 975 43 2 6 43 2 7 43 2 8 43 2 9 43 2 9 to 1000 43 2 5 43 2 5 43 2 6 43 2 7 43 2 8 4500 1025 43 2 3 43 2 4 43 2 5 43 2 6...

Страница 15: ...0 43 2 5 43 2 6 43 2 7 43 2 8 43 2 9 to 775 43 2 4 43 2 5 43 2 5 43 2 6 43 2 7 800 43 2 2 43 2 3 43 2 4 43 2 5 43 2 5 7000 825 43 2 1 43 2 2 43 2 2 43 2 3 43 2 4 850 48 3 7 43 2 0 43 2 1 43 2 2 43 2 3...

Страница 16: ...U S A Only 575 43 2 7 43 2 8 43 2 9 43 3 0 43 3 1 600 43 2 5 43 2 6 43 2 7 43 2 7 43 2 8 9001 625 43 2 3 43 2 4 43 2 4 43 2 5 43 2 6 650 43 2 1 43 2 2 43 2 3 43 2 3 43 2 4 to 675 48 3 7 43 2 0 43 2 1...

Страница 17: ...dually block off the return air after the furnace has been operating for a period of at least 5 minutes As soon as the limit has shut off the burners the return air opening should be unblocked By usin...

Страница 18: ...us code 31 If hot surface igniter glows when inducer motor is disconnected shut down furnace immediately Determine reason pressure switch did not function properly and correct condition e Turn off 115...

Страница 19: ...d Slope ____________ Joints Secure ____________ See Attached Vent Table Instructions CHECKLIST START UP ____________ Gas Input Rate Set Within 2 percent of Rating Plate ____________ Temperature Rise A...

Страница 20: ...Training plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog...

Отзывы: