Install a BT485 on the first and last controller on a network segment to add bias and prevent signal
distortions due to echoing.
See the
MS/TP Networking and Wiring Installation Guide
for more details.
Wiring specifications
Cable:
22 AWG or 24 AWG, low-capacitance, twisted, stranded, shielded copper wire
Maximum length:
2000 feet (610 meters)
To wire the controller to the network
1
Pull the screw terminal connector from the controller's power terminals labeled
Gnd
and
24 Vac
or
Hot
.
2
Check the communications wiring for shorts and grounds.
3
Connect the communications wiring to the BACnet port’s screw terminals labeled
Net +
,
Net -
, and
Shield
.
NOTE
Use the same polarity throughout the network segment.
4
Verify that the
MSTP
jumper is set to
MSTP
.
5
Set DIP switches 1 and 2 to the appropriate baud rate. See the MSTP baud diagram on the RTU Open.
The default baud rate is 76.8 kbps.
NOTE
Use the same baud rate for all controllers on the network segment.
6
Insert the power screw terminal connector into the RTU Open's power terminals.
7
Verify communication with the network by viewing a module status report.