NEC. REQUIRED CLEARANCES
INCHES
[MM]
BETWEEN UNITS, POWER ENTRY SIDE........................................42.0 [1067]
UNIT AND UNGROUNDED SURF
ACES, POWER ENTRY SIDE.....36.0 [914]
UNIT AND BL
OCK OR CONCRETE WALLS AND OTHER
GROUNDED SURF
ACES, POWER ENTRY SIDE............................42.0 [1067]
SIDE OF UNIT WITH DUCT OPENINGS.............................................0 0
REQUIRED CLEARNACE FOR SERVICING
TOP OF UNIT
......................................................................................36.0 [914]
SIDE OF UNIT OPPOSITE DUCT OPENINGS..................................30.0 [762]
SIDE OF UNIT WITH POWER ENTRY
...............................................30.0 [762]
(EX
CEPT FOR NEC REQUIREMENTS)
NOTE: CLEARANCES MUST BE MAINT
A
INED TO PREVENT RECIRCUL
A
T
ION OF AIR FROM
OUTDOOR F
A
N DISCHARGE. A REMOV
ABLE FENCE OR BARRICADE REQUIRES NO
CLEARANCE.
DIMENSIONS IN [ ] ARE IN MM
A10295
Fig. 4 -- Unit Base Dimensions, PA3Z--B024--036
PA
3Z
B
Содержание PA3Z-B
Страница 10: ...10 Table 3 Superheat Charging A10038 Table 4 Required Subcooling A10039 PA3ZB ...
Страница 13: ...13 24 VOLT THERMOSTAT CONNECTIONS A10024L Fig 13 Cont Typical Single Phase Ladder Electrical Diagram PA3ZB ...
Страница 14: ...14 A10025 Fig 14 Single Phase Accessory Electric Heater Wiring PA3ZB ...