
GB-
3
4. INSTALLATION METHOD
9. Connect the smart port to the wire controller (if
needed)
①
Remove the top cover from the gap between the
top cover and bottom by a tool with flat head. (See
Fig.4-11)
②
Use the connective cable to connect the wire
controller and CN3 of the smart port. (See Fig.4-12)
(refer to the Wire controller manual for details)
CN3
Fig 4-11
Fig 4-12
NOTE:
• Connection for R485 Communication wired
controller.
4. INSTALLATION METHOD
Putty
Trap
Putty
Fig 4-9
CAUTION
Trap
Avoid the water enter into the smart port, use trap
and putty to seal the connectors of wires during
wiring installation. (Fig. 4-9) When under installation,
reserve certain length of the connecting wire for
convenient to take down the smart port while during
maintenance.
8.Reattach the upper part of the smart port
• After adjusting the upper case and then buckle
the upper case; avoid clamping the wiring during
installation. (Fig 4-10)
Fig 4-10
4. INSTALLATION METHOD
7.Wiring
A. For exposed mounting, two outletting positions.
Top side wire outlet
Bottom side wire outlet
Fig 4-7
B. Shielded wiring
Wiring through the wall
Wiring hole and wall hole
Diameter of wall hole:Φ20mm
Fig 4-8
4. INSTALLATION METHOD
5. Fasten the back plate of the smart port
• For exposed mounting, fasten the back plate on
the wall with the 3 screws (M4×20) and plugs.
(Fig.4-5)
Back plate
Screws (M4×20)
Fig 4-5
6. Insert the smart kit with slightly strength into the
main PCB of the smart port .(Fig.4-6)
Fig 4-6