19
62-12119
OPERATIONAL INSPECTION
Refer to
30. Remove the Lock Out / Tag Out device and plug the unit in to
power supply.
31. Install the manifold gauge set.
32. Turn unit power on and change the setpoint to 32°F (0°C).
33. Check that voltage is good on all 3 phases of CH Contactor.
a. Check Cd07.
b. Acceptable ranges are: 50Hz, 360-460V & 60Hz, 400-500V.
34. Verify the container software / model / ID / time.
a. Check Cd18 to verify the software installed (57xx). It is rec
-
ommend to always have the latest software installed.
b. Check Cd20 to verify the model number. This should match
the last 5 digits of the model number on the nameplate (i.e.
for 69NT40-601-001 the display will show 01001).
c. Check Cd40 to verify the Container ID to ensure correct set up.
d. Check dC32, dC33, dC34 to verify the clock is set to the cur
-
rent Greenwich Mean Time (GMT).
35. Check fans for proper rotation.
a. Check the gas cooler fan by placing a piece of paper on the gas
cooler grill and verify it is blowing out. Refer to
.
Figure 23 Gas Cooler Fan Rotation
b. Check the evaporator fans by verifying that air is pushing out
by the bottom kick plate and sucking in on the top grille. Refer
to