![Carrier Gemini 38AU07 Series Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/carrier/gemini-38au07-series/gemini-38au07-series_installation-instructions-manual_2563540035.webp)
35
These ports are
1
/
4
-in. SAE Flare couplings with Schrader
check valves and service caps. Use these ports to admit nitro-
gen to the field tubing during brazing, to evacuate the tubing
and evaporator coil, to admit initial refrigerant charge into the
low-side of the system and when checking and adjusting the
system refrigerant charge. When service activities are com-
pleted, ensure the service caps are in place and secure; check
for leaks. If the Schrader check valve must be removed and
re-installed, tighten to 2-3 in.-lbs (23-34 N-cm).
Fig. 35 — Typical Exterior, Single-Circuit Unit
(38AUZ*08 shown)
Fig. 36 — Typical Exterior, Two-Circuit Unit
(38AUD*14 shown)
FACTORY HIGH-FLOW ACCESS PORTS
There are two additional access ports in the system - on
the suction tube between the compressor and the suction ser-
vice valve and on the liquid tube near the liquid service valve
(see Fig. 37 and 38). These are brass fittings with black plas-
tic caps. The hose connection fittings are standard
1
/
4
-in. SAE
Male Flare couplings.
Fig. 37 — Typical Interior, Single-Circuit Unit
(38AUZ*08 shown)
Fig. 38 — Typical Interior, Two-Circuit Unit
(38AUD*14 shown)
The brass fittings are two-piece High Flow valves, with a
receptacle base brazed to the tubing and an integral spring-
closed check valve core screwed into the base. See Fig. 39.
This check valve is permanently assembled into this core body
and cannot be serviced separately; replace the entire core body
Condenser Fans
Service
Valves
Condenser Fans
Service
Valves
Содержание Gemini 38AU07 Series
Страница 5: ...5 Fig 3 38AUD Z 07 14 Base Unit Dimensions ...
Страница 19: ...19 Fig 17 Typical Single Circuit Single Stage 38AUZ Wiring Diagrams ...
Страница 20: ...20 Fig 18 Typical Single Circuit Two Stage 38AUZ Wiring Diagram ...
Страница 21: ...21 Fig 19 Typical Dual Circuit Two Stage 38AUD Wiring Diagram ...
Страница 30: ...30 Fig 30 38AUZD E08 Charging Chart RTPF 7 5 Ton Dual Stage Charging Chart R 410A Refrigerant ...
Страница 46: ...46 APPENDIX C LOW AMBIENT OPTION FACTORY INSTALLED CONT Fig C Wind Baffles D K J H G F E C B A ...
Страница 48: ......
Страница 49: ......