GB
D
F
I
10
Carrier
PIANO PAVIMENTO
fig.7.b
Insulate the whole suc-
tion line
-First section of the
suction line in an
installation having
the compressor
sited above the
evaporator (diffe-
rence of level less
than 3 mt)
fig.7
PIANO PAVIMENTO
fig.7.c
Insulate the whole
suction line
-First section of the
suction line in an
installation having
the compressor
sited above the
evaporator (diffe-
rence of level
more than 3 mt).
FLOOR PLANE
FLOOR PLANE
Содержание CU-O Series
Страница 30: ...72 Carrier N NO OT TE E N NO OT TE ES S...
Страница 31: ...Carrier 73 N NO OT TE E N NO OT TE ES S...
Страница 32: ...0MAN090 C del 04 2001...