Push button switch attributes

X = closed

O = open

Terminals

1

2

3

4

5

6

7

8

1A 1B 2A 3A 4A 5A 6A 7A 8A

Stop

X

O

O

O

O

O

O

O

O

Fan only

X

O

O

O

O

X

O

O

O

Low cool

O

X

X

O

O

O

X

O

O

High cool

O

X

X

O

O

O

O

X

O

Low heat

X

O

O

X

X

O

X

O

O

High heat

X

O

O

X

X

O

O

X

X

Blower motor wiring

Unit size

Pole A Pole B

007

5

3

009

5

4

012

4

3

015

4

3

019

4

3

Legend
AL

Alarm relay contacts

BM

Blower motor

BR

Blower relay

CAP

Capacitor

CB

Circuit breaker

CO

Sensor, condensate overflow

CR

Compressor relay

DM

Damper motor

FP1

Sensor, water coil freeze protection

FP2

Sensor, air coil freeze protection

GND

Ground

HP

High pressure switch

JW1

Jumper wire for alarm

LOC

Loss of charge pressure switch

PB

Power terminal block

PBS

Push button switch

PM

Performance Monitor

RVS

Reversing valve solenoid

TRANS

Transformer optional wiring

UMT

Unit mounted thermostat

WV

Water valve

Field line voltage wiring

Field low voltage wiring

Printed circuit trace

Option low voltage wiring

Relay/contactor coil

Solenoid coil

Thermistor

Circuit breaker

Relay contacts - NO

Temperature switch

High pressure switch

Low pressure switch

Ground

Wire nut

Mate-N-Lock

* Optional wiring

Notes:
1.

Compressor and blower motor thermally protected internally.

2.

All wiring to the unit must comply with local codes.

3.

Transformer is wired to 240 V (ORG) lead for 240-1-50 units. For 220-1-50
switch ORG and RED leads at PB(1) and insulate ORG lead. Transformer is
energy limiting or may have circuit breaker.

4.

FP1 thermistor provides freeze protection for water. When using anti-freeze
solutions, cut JW3 jumper.

5.

Typical unit-mounted thermostat wiring shown.

6.

24-V alarm signal shown. For dry alarm contact, cut JW1 jumper, and dry
contact will be available between AL1 and AL2.

7.

Transformer secondary ground via Complete C board stand-offs and screws to
control box. (Ground available from top two stand-offs as shown.)

Power Supply

Refer to Data Plate.

Use copper

conductors only.

See Note 2

GROUND

GND LUG

G/Y

G/Y

BLK

BLK

RED

RED

RED

BLK

BR1

E(GND)

GROUND

NEUTRAL

220/240-1-50

L

PB

(GROUND TO CONTROL DOOR)

G/Y

G/Y

BR2

COM

N.O.

BLK

YEL

LOW

HIGH

A

B

BM

CAP

C

BRN

1

2

BLK

RED

(220V)

6

5

4

3

2

1

CB

F

H

BLU

COMPRESSOR

RED

BLK

R

S

C

CR

2

4

COM

N.O.

ORG (240V)

YEL

TRANS

24V

SEE
NOTE 7

BRN

YEL

BRN
BRN

BLU

SEE
NOTE 7

CR

YEL

BRN

BR

BRG

CCG

CC

YEL

YEL

RED

6A

RED

5A

RED

5

RED

GRY

RED

RED

PBS

RED
RED

ORG

BRN

BR2

BR1

YEL

2A

2

3

3A YEL

UMT

2

3

1

6

7A

BRN

7

YEL

RED

YEL YEL

ORG

BRN

DM

WV

1

1A

1B

R

Y

COMPLETE

C

CONTROL

UMT

BR1

BR2

PBS

CR

CAP

PB

GROUND

TRANSFORMER

Y

W

O

G

R

C

AL1

AL2

A

P1

ALARM

RELAY

C

SEE
NOTE 6

JW1

YEL

JW3

FP1

JW2

FP2

SEE
NOTE 4

TEST PINS

COMPR.
RELAY

DIP SWITCH

OFF ON

STATUS
LED

G

COMPLETE C

MICRO-

PROCESSOR

CONTROL

LOGIC

HP

LOC

FP1

FP2

RVS

CO

SEE
NOTE 4

HP

LOC

FP1

FP2

RV

CO12

P2

24V
DC

EH1
EH2

P3

CO

1
2
3

4
5
6

7

8

9

10

PM: DISABLED/
ENABLED
STAGE 2: 2/1
NOT USED
NOT USED

FP1/FP2
FAULTS: 3/1

1

2
3
4

5

1

0

RED

RED

BLU

BRN

GRY

GRY

VIO

VIO

BRN

ORG

NOT USED

Power supply
Refer to data plate
Use copper
conductors only
See note 2

Neutral
220/240-1-50

Earth (GRD)

Ground

Ground

Gnd lug

(Ground to control door)

Low

High

Compressor

See
note 7

Test pins

Comp.
relay

See
note 4

Dip switch

PM disabled
Enabled
Stage 212
Not used
Not used

FP1/FP2

Faults

Off On

Status
LED

Alarm
relay

See
note 6

Complete C

micro-processor

control logic

See note 4

Not used

Ground

Transformer

Complete C
control

>>

Fig. 11 - Manual changeover with Complete C controller wiring

See
note 7

Содержание AQUAZONE 50KQE 007

Страница 1: ...ating in the Eurovent Certification Programme Products are as listed in the Eurovent Directory of Certified Products 50KQE 007 019 Water Source Heat Pumps Console Units Installation OperationandMaintenanceInstructions TM ...

Страница 2: ...START UP 22 6 1 Unit start up cooling 22 6 2 Operating limits 22 6 3 Unit start up heating 22 6 4 Flow regulation 22 6 5 Anti freeze 23 6 6 Cooling tower boiler systems 23 6 7 Ground coupled closed loop and plateframe heat exchanger well systems 23 7 OPERATION 24 7 1 Power up mode 24 7 2 Units with Aquazone Complete C control 24 7 3 Units with Aquazone Deluxe D control 24 8 SYSTEM TEST 25 8 1 Test...

Страница 3: ...s which make up the installation shall be in accordance with the regulations of ALL authorities having jurisdiction and MUST conform to all applicable codes It is the responsibility of the installing contractor to determine and comply with ALL applicable codes and regulations 3 INSTALLATION 3 1 Check jobsite Units are typically installed along an outside wall of the room Refer to Figs 1A and 1B fo...

Страница 4: ...nsate 5 8 15 9 mm ID Vinyl Hose Optional Disconnect Box mounted to cabinet not chassis Optional Motorized Water Valve Optional Autoflow Valve Water Connections 5 8 15 9 mm OD Copper 1 2 FPT or 1 2 MPT 90 30 Power Supply Blower Deck Blower Access Panel 89 49 114 19 99 293 82 49 423 179 30 22 76 136 Condensate 5 8 15 9 mm ID Vinyl Hose Optional Disconnect Box mounted to cabinet not chassis Optional ...

Страница 5: ...er located inside and at top of air inlet area Push tabs back and down to release filter for replacement Discharge air Side view Air inlet Bottom view Right handpipe and electric area Rear access Rear view Dimension shown is with 76 mm subbase Add 51 mm to dimension shown for 127 mm subbase Notes 1 All dimensions are in millimetres 2 Optional autoflow valve motorised water valve and disconnect box...

Страница 6: ...r located inside and at top of air inlet area Push tabs back and down to release filter for replacement Discharge air Side view Air inlet Bottom view Left handpipe and electric area Rear access Rear view Damperopening Dimension shown is with 76 mm subbase Add 51 mm to dimension shown for 127 mm subbase Notes 1 All dimensions are in millimetres 2 Optional autoflow valve motorised water valve and di...

Страница 7: ... Control access door Front view Filter located behind return air grille and requires removal of cabinet front for access Discharge air Side view Air inlet Bottom view Right handpipe and electric area Rear access Notes 1 All dimensions are in millimetres 2 Optional autoflow valve motorised water valve and disconnect box are shown Rear view ...

Страница 8: ... Control access door Front view Filter located behind return air grille and requires removal of cabinet front for access Side view Air inlet Bottom view Left handpipe and electric area Rear access Notes 1 All dimensions are in millimetres 2 Optional autoflow valve motorised water valve and disconnect box are shown Rear view Discharge air ...

Страница 9: ...hassis Blower access panel Right handconfiguration Left handconfiguration Power supply Control box Water in Water out Compressor access panel Condensate 5 8 ID vinyl hose Optional autoflow valve Water connections 5 8 OD copper 1 2 FPT or 1 2 MPT Blower deck Optional disconnect box mounted to cabinet not chassis Blower access panel Optional motorised water valve For installed dimension add to dimen...

Страница 10: ...he backplate Protect the cabinet from damage during installation by returning it to its original vinyl pack until required 2 Remove compressor isolation plate shipping screws 4 as shown in Fig 7 3 Using a carpenter s square and a level ensure the unit is level Shim the unit if necessary to assure proper installation Poor or inadequate installation may result in noisy unit operation or unattractive...

Страница 11: ...nsider special wiring conditions The valve takes approximately 60 seconds to open very little water will flow before 45 seconds and it activates the compressor only after the valve is completely opened by closing its end switch When wired as shown the valve will have the following operating characteristics 1 Remain open during a lockout 2 Draw approximately 25 to 35 VA through the Y signal of the ...

Страница 12: ...own 6 24 V alarm signal shown For dry alarm contact cut JW1 jumper and dry contact will be available between AL1 and AL2 7 Transformer secondary ground via Complete C board stand offs and screws to control box Ground available from top two stand offs as shown Power Supply Refer to Data Plate Use copper conductors only See Note 2 GROUND GND LUG G Y G Y BLK BLK RED RED RED BLK BR1 E GND GROUND NEUTR...

Страница 13: ...Push button switch PM PerformanceMonitor RVS Reversing valve solenoid TRANS Transformer optional wiring UMT Unit mounted thermostat WV Water valve Field line voltage wiring Field low voltage wiring Printed circuit trace Option low voltage wiring Relay contactorcoil Solenoid coil Thermistor Circuitbreaker Relay contacts NO Temperatureswitch High pressure switch Low pressure switch Ground Wire nut M...

Страница 14: ... Field low voltage wiring Printed circuit trace Option low voltage wiring Relay contactorcoil Solenoid coil Thermistor Circuitbreaker Relay contacts NO Temperatureswitch High pressure switch Low pressure switch Ground Wire nut Mate N Lock Optional wiring Notes 1 Compressor and blower motor thermally protected internally 2 All wiring to the unit must comply with local codes 3 Transformer is wired t...

Страница 15: ...OTE 4 CO RVS R C SEE NOTE 7 P1 COM2 COM1 RED POWER SUPPLY REFER TO DATA PLATE USE COPPER CONDUCTORS ONLY SEE NOTE 2 PB E GND NEUTRAL 220 240 1 50 G Y G Y RED BLK CB BLK RED 220V ORG 240V 24V YEL BLU GROUND BLK RED BLK GROUND TO CONTROL DOOR G Y G Y GND LUG GROUND 1 2 BRN YEL F C CAP BLU RED COMPR S C R B HIGH A LOW TRANS RED BR 2 HI COM NO BR 1 LO COM NO BM L JW1 LP TEST PINS JW2 FP2 JW3 FP1 LOW L...

Страница 16: ...mplete C controller wiring COMPLETE C CONTROL BR CR CAP PB GROUND TRANSFORMER BRN YEL Y W O G R C AL1 AL2 A P1 ALARM RELAY SEE NOTE 6 JW1 WV COMPRESSOR COOLING FAN 24 VAC COMMON ALARM CLASS 1 WIRING REQUIRED INSIDE CONTROL BOX Y O G R C L CLASS 1 OR 2 WIRING ACCEPTABLE OUTSIDE CONTROL BOX TYPICAL HEAT PUMP T STAT SEE NOTE 5 BRN YEL BLU R Y JW3 FP1 JW2 FP2 SEE NOTE 4 COMPR RELAY STATUS LED G COMPLE...

Страница 17: ...FAULT R RV RELAY TEST PINS JW3 FP1 LOW JW2 FP2 LOW SEE NOTE 4 JW1 LP N O YEL YEL BRN BRN BR 2 HI BR 1 LO COM NO NO NC COM FAN SPEED RELAY FAN ENABLE RELAY RED GRY Y1 Y1 W1 O W2 G R C AL1 COMPRESSOR COOLING FAN 24 VAC COMMON ALARM CLASS 1 WIRING REQUIRED INSIDE CONTROL BOX Y O G R C X1 CLASS 1 OR 2 WIRING ACCEPTABLE OUTSIDE CONTROL BOX TYPICAL HEAT PUMP T STAT SEE NOTE 5 BRN SEE NOTE 7 AL2 R NSB C ...

Страница 18: ...e used unions are not necessary 3 Install strainers at the inlet of each system circulating pump NOTE Since loop temperatures are normally between 15 and 32 C pipe sweating and heat loss do not occur at normal ambient temperature conditions Insulation must be installed on loop water piping on those sections that run through unheated areas or are located outside the building If loop temperatures ar...

Страница 19: ...ill foul the system and will inhibit unit operation 11 When the system is successfully cleaned flushed refilled and bled check the main system panels safety cutouts and alarms Set the controls to properly maintain loop tempera tures 4 2 System checkout When the installation is complete and the system is cleaned and flushed follow the System Checkout procedure outlined below 1 Voltage Ensure voltag...

Страница 20: ... impedes unit operation and causes corrosion in the system piping 10 Unit filters To avoid system damage and to provide maxi mum performance ensure the unit filter is clean 11 Unit fans Manually rotate fans to assure free rotation Ensure fans are properly secured to the fan shaft Do not oil fan motors on start up since they are lubricated at the factory 12 System control centre To ensure control o...

Страница 21: ...heating as long as the FP1 is above 10 C The compressor will not be used for heating when the FP1 is below 10 C and the compressor will operates in emergency heat mode staging on EH1 and EH2 to provide heat If a thermal switch is being used instead of the FP1 thermistor only the compressor will be used for heating mode when the FP1 terminals are closed If the FP1 terminals are open the compressor ...

Страница 22: ...ater at nominal flow rates NOTE These operating limits are not normal or continuous operating conditions It is assumed that such a start up is for the purpose of bringing the building space up to occupancy temperature 6 3 Unit start up heating 1 Adjust the unit thermostat to the warmest setting and turn the fan speed switch to HI If the unit has an optional MCO thermostat set the selector switch t...

Страница 23: ... faults 6 6 Cooling tower boiler systems These systems typically use a common loop maintained at 15 6 to 32 2 C Carrier recommends using a closed circuit evaporative cooling tower with a secondary heat exchanger between the tower and the water loop If an open type cooling tower is used continuously chemical treatment and filtering will be necessary Table 9 Approximate fluid volume l per 30 m of pi...

Страница 24: ... heating stage 2 mode the fan enable and compressor relays are remain on The fan speed relay is turned on immediately and turned off immediately once the demand is removed The control reverts to heating stage 1 mode If there is a master slave or dual compressor application all compressor relays and related func tions will operate per their associated DIP switch 2 setting on S1 7 3 4 Heating stage ...

Страница 25: ... a 10 second pause This sequence will repeat continually until the fault is cleared Table 12 Complete C control LED code and fault descriptions LED code Fault Description 1 No fault in memory There has been no fault since the last power down to power up sequence 2 High pressure switch HP open instantly 3 Low pressure switch LP open for 30 continuous seconds before or during a call bypassed for fir...

Страница 26: ...nt injury or death due to electrical shock or contact with moving parts open unit disconnect switch before servicing unit 9 1 Unit inspection Visually inspect the unit at least once a month Pay special atten tion to hose assemblies Repair any leaks and replace deteriorated hoses immediately Note any signs of deterioration or cracking 9 2 System flushing Properly clean and flush system periodically...

Страница 27: ...18 9 6 2 Forced circulation method Fully open vent pipe when filling condenser The vent may be closed when condenser is full and pump is operating see Fig 19 Regulate flow to condenser with a supply line valve If pump is a non overloading type the valve may be fully closed while pump is running For average scale deposit allow solution to remain in condenser overnight For heavy scale deposit allow ...

Страница 28: ...e water flow and internal malfunctions If the unit continues to cut out contact a trained service technician WARNING When replacing the compressor contactor or lockout relay in a unit with electromechanical controls use only Carrier factory authorized parts Substitution of other components may result in an inoperative safety circuit and may cause a hazardous condition 9 11 Checking system charge U...

Страница 29: ...operation and airflow restrictions External static too high X Air temperature out of range Too much cold vent air Bring entering air temperature within design parameters X Improper freeze protect setting Normal airside applications will require 1 1 C only 1 1 C vs 12 2 C X X Bad thermistor Check temperature and impedance correlation Condensate fault code 6 X X Blocked drain Check for blockage and ...

Страница 30: ...ds and sizing check sensible cooling load and heat pump capacity X X Scaling in water heat exchanger Perform scaling check and clean if necessary X X Inlet water too hot or cold Check load loop sizing loop backfill ground moisture High head pressure X Reduced or no airflow in heating Check for dirty air filter and clean or replace Check fan motor operation and airflow restrictions External static ...

Страница 31: ...R COIL C kPa WATER OUT WATER IN C kPa LOOK UP PRESSURE DROP IN TABLE 10 TO DETERMINE FLOW RATE C LIQUID LINE kPa C DEW POINT Air coil Expansion valve Liquid line Water in Water out Heat exchanger Look up pressure drop in Table 8 to determine flow rate Dew point Suction Compressor Discharge SUCTION COMPRESSOR DISCHARGE COAX EXPANSION VALVE C C AIR COIL C kPa WATER OUT WATER IN C kPa LOOK UP PRESSUR...

Страница 32: ... phase scroll compressor is present verify proper rotation per instructions Y N __________ Unit voltage cooling operation Phase AB Volts ________ Phase BC Volts ________ Phase CA Volts ________ if 3 phase if 3 phase Phase AB Amps ________ Phase BC Amps ________ Phase CAAmps ________ if 3 phase if 3 phase Control voltage Is the control voltage above 21 6 Volts Y N __________ If not check for proper...