e. Cement 2 factory-supplied 1/2-in. street CPVC elbows to
the rigid drain tube connection on the condensate trap. (See
Fig. 6.) These elbows must be cemented together and
cemented to condensate trap drain connection.
NOTE:
Failure to use CPVC elbows may allow drain to kink and
prevent draining.
f. Connect larger diameter drain tube and clamp (factory-
supplied in loose parts bag) to condensate trap and clamp
securely.
g. Route tube to coupling and cut to appropriate length.
h. Attach tube to coupling and clamp securely.
CONDENSATE TRAP LOCATION (ALTERNATE UPFLOW
ORIENTATION)
An alternate location for the condensate trap is the left-hand side
of casing. (See Fig. 2 and 7.)
NOTE:
If the alternate left-hand side of casing location is used,
the factory-connected drain and relief port tubes must be discon-
nected and modified for attachment. See Condensate Trap Tubing
(Alternate Upflow Orientation) section for tubing attachment.
To relocate condensate trap to the left-hand side, perform the
following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts
bag) into blower shelf hole where trap was removed.
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury
or death.
Casing hole filler cap must be installed in blower shelf hole
when condensate trap is relocated to prevent combustion
products being drawn in from appliances in the equipment
room.
4. Install condensate trap into left-hand side casing hole by
inserting tube connection stubs through casing hole and
rotating until tabs snap into locking position.
5. Fill unused condensate trap casing holes with plastic filler
caps (factory-supplied in loose parts bag).
CONDENSATE TRAP TUBING (ALTERNATE UPFLOW
ORIENTATION)
NOTE:
See Fig. 7 or tube routing label on main furnace door to
confirm location of these tubes.
1. Collector Box Drain Tube
Connect collector box drain tube (blue label) to condensate
trap.
NOTE:
On 17-1/2 in. wide furnaces ONLY, cut tube between
corrugated sections to prevent kinks from occurring.
Fig. 5—Condensate Trap
A93026
1
⁄
2
OD
INDUCER HOUSING
DRAIN CONNECTION
1
⁄
4
OD
COLLECTOR BOX TO
TRAP RELIEF PORT
5
⁄
8
OD
COLLECTOR BOX
DRAIN CONNECTION
1
⁄
2
-IN. PVC OR CPVC
SCREW HOLE FOR
UPFLOW OR DOWN-
FLOW APPLICATIONS
(OPTIONAL)
1 4
2
7 8
1 8
7
SLOT FOR SCREW
HORIZONTAL
APPLICATION
(OPTIONAL)
WIRE TIE
GUIDES
(WHEN USED)
1 2
1
3 4
1
3 4
FRONT VIEW
SIDE VIEW
FURNACE
DOOR
FURNACE
DOOR
CONDENSATE
TRAP
78
1 4
26
4
FURNACE
SIDE
FURNACE
SIDE
1 2
1
1 4
26
4
3 4
5
3 4
5
4
SIDE VIEW
FRONT VIEW
END VIEW
FRONT VIEW
3 4
DOWNFLOW AND ALTERNATE
EXTERNAL UPFLOW APPLICATIONS
HORIZONTAL
APPLICATIONS
FIELD
DRAIN
CONN
FIELD
DRAIN
CONN
CONDENSATE
TRAP (INSIDE)
BLOWER SHELF
ALTERNATE DRAIN
TUBE LOCATION
UPFLOW APPLICATIONS
CONDENSATE TRAP
DRAIN TUBE LOCATION
7
Содержание 58MXB Series
Страница 31: ...Table 8 Direct Vent Termination Clearance A05009 31 ...
Страница 32: ... Table 9 Other than Direct Vent Termination Clearance A05013 32 ...
Страница 59: ...59 ...