
CONNEC
16.7 DES
16.8 DES
16-9 DE
OF
(1)
(2)
16.10 CU
Mak
Pip
Outdoor Un
38KHRT12
38KHRT18
TING REF
SCRIPTION
(1
(3
(5
(7
SCRIPTION
ESCRIPTIO
F REFERIG
Gas piping
Liquid pipin
UTTING AN
ke sure that
pe Cutter
nits
RIGERANT
N OF REFR
) Gas flare
3) Gas port
5) Cap for g
7) Liquid po
N OF REF
ON OF RE
GERANT P
line
ng line
ND FLARI
have the req
7
6
8
Ind
T PIPING (
RIGERAN
e valve.
to open & c
gas port.
ort to open &
FRIGERAN
EFRIGERA
PIPING LIN
NG TOOL
quired tools
4
2
3
1
oor Unit
29
(Cont.)
T CONNE
close.
& close.
NT CONNE
ANT CONN
NES
LS
s available b
5
5
3
7
8
CTIONS O
(2) Gas s
(4) Cap f
(6) Liqui
(8) Cap f
ECTIONS O
Refr
Connect
NECTIONS
before prepa
Flare Too
5
OF OUTDO
service valv
for gas serv
d flare valve
for liquid po
OF INDOO
rigerant
tions Details
S
aring refriger
Half Unio
Gas
Half Union
Liquid
ol
(1)
(2)
4
2
1
6
OOR UNIT
e.
vice valve.
e.
ort.
OR UNIT
rant piping l
n
n
Outdoo
38KHR
T
lines
or Unit
RT24
Содержание 53KHRT 12-18-24 Crystal
Страница 54: ...www miraco com eg...