
16
13. INDOOR UNIT INSTALLATION
13-1 PREPARATION STEPS BEFORE INSTALLATION
STEP (1) :Selecting Wall Hole Location
Back right or Back left piping :
In case of passing refrigerant piping lines, electrical cables and condensate drain line behind the unit,
drill a hole of 65mm behind the unit in one of the following locations as per the section :
Right Side or Left Side Piping :
In case of passing refrigerant piping lines, electrical cables and condensate drain line from unit right side
or from unit left side, remove the pipe cover form the side panel.
Size 12K
Size 18K
Size 24K
Right rear side refrigerant
pipe hole ø 65
45
90
120
mm or
more to wall
Left rear side refrigerant
pipe hole ø 65
120
mm or
more to wall
40
40
780
Indoor unit outline
Installation plate
150mm or more to ceiling
270
Indoor unit outline
Installation plate
150mm or more to ceiling
120
mm or
more to wall
120
mm or
more to wall
920
45
270
70
70
Left rear side refrigerant
pipe hole ø 65
Right rear side refrigerant
pipe hole ø 65
150mm or more to ceiling
Hooked Part
120
mm or
more to wall
120
mm or
more to wall
380
380
138
1036
315
130
Indoor unit outline
22
130
50
Содержание 53KHRT 12-18-24 Crystal
Страница 54: ...www miraco com eg...