
7
R e s i d e n t i a l D i g i t a l P a c k a g e d U n i t s G T- P B S e r i e s - 6 0 H z P u ro n
®
R e v : 4 A p r i l , 1 4
Horizontal Installation
(by others)
(by others)
Unit Power
Disconnect
Power Wiring
Return Air
Supply Air
Unit Hanger
3/8" [10mm] threaded rods
Unit Power
Flexible Duct
Connector
Flush
Ports
Water
Pressure Ports
Internal
Variable-Speed
Pump
Insulated supply duct with
at least one 90 deg elbow
to reduce air noise
Water Out
Water In
Figure 6a: Typical Closed Loop Horizontal Unit Installation (with Internal Flow Controller)
Air Coil
- To obtain maximum performance, the air coil should be cleaned
before start-up. A 10% solution of dishwasher detergent and water is
recommended for both sides of the coil. A thorough water rinse should follow.
Figure 6b: Typical Ground Water Horizontal Unit Installation (with Internal Motorized Modulating Valve)
Pressure
Tank
(by others)
Ball Valves
Power Wiring
Insulated supply duct with
at least one 90 deg elbow
to reduce air noise
Return Air
Supply Air
3/8" [10mm] threaded rods
Unit Power
Internal Motorized
Modulating Valve
Water
Pressure Ports
Boiler
Drains
:DWHU
2XW
:DWHU,Q
(by others)
Unit Power
Disconnect
Flexible Duct
Connector
Unit Hanger
Содержание 50YFH
Страница 2: ...This page was intentionally left blank ...