UNIT START-UP CHECKLIST (REMOVE AND USE FOR JOB FILE)
I. PRELIMINARY INFORMATION
MODEL NO ____________________________________________
JOB NAME _____________________________________________
SERIAL NO ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor-air hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor-air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Supply Fan Amps
L1 _____________
L2 _____________
L3 _____________
TEMPERATURES
Outdoor-Air Temperature
_____________ °F DB (Dry Bulb)
Return-Air Temperature
_____________ °F DB
_____________
°F Wb (Wet Bulb)
Cooling Supply Air Temperature
_____________ °F
PRESSURES
Refrigerant Suction
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
Refrigerant Discharge
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
Verify Refrigerant Charge using Charging Charts (Y/N) _____
GENERAL
Economizer minimum vent and changeover settings to job requirements (if equipped) (Y/N) _____
Verify smoke detector unit shutdown by utilizing magnet test (Y/N) _____
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preced
-
ing sections of this Installation Instruction document.
Содержание 50KC04
Страница 4: ...4 Fig 2 Unit Dimensional Drawing of Units Built On and After 4 15 19...
Страница 5: ...5 Fig 3 Unit Dimensional Drawing of Units Built on and Prior to 4 15 19...
Страница 6: ...6 Fig 4 Unit Corner Weights and Clearances...
Страница 7: ...7 Fig 5 Base Rail Details...
Страница 8: ...8 Fig 6 Thru the Base Charts...
Страница 35: ...35 Fig 49 Electro Mechanical Control Wiring Diagram...
Страница 36: ...36 Fig 50 Electro Mechanical Control Wiring Diagram with Humidi MiZer System...
Страница 37: ...37 Fig 51 Electro Mechanical Power Wiring...
Страница 38: ...38 Fig 52 PremierLink Wiring Schematic...
Страница 39: ...39 Fig 53 PremierLink Wiring Schematic with Humidi MiZer System...
Страница 40: ...40 Fig 54 RTU Open System Control Wiring Diagram...
Страница 41: ...41 Fig 55 RTU Open System Control Wiring Diagram with Humidi MiZer System...
Страница 47: ...47 Fig 63 TXV Metering Device Position in Reheat Coil Typical Diagram for Sizes 04 06 TXV...
Страница 48: ......
Страница 49: ......