59
Smoke Detectors
Smoke detectors are available as factory-installed options on
48TC models. Smoke detectors may be specified for supply air
only, for return air without or with economizer, or in combina-
tion of supply air and return air. The unit is factory-configured
for immediate smoke detector shutdown operation; additional
wiring or modifications to unit terminal board may be necessary
to complete the unit and smoke detector configuration to meet
project requirements.
RETURN AIR SENSOR TUBE INSTALLATION
The return air sampling tube is shipped in the unit’s supply fan
section, attached to the blower housing (see Fig. 64). Its operating
location is in the return air section of the unit (see Fig. 65, unit
without economizer, or Fig. 66, unit with economizer), inserted
into the return air sensor module housing which protrudes through
the back of the control box.
Fig. 64 — Typical Supply Air Smoke Detector Sensor
Location
Fig. 65 — Return Air Sampling Tube Location in Unit
without Economizer
Fig. 66 — Return Air Sampling Tube Location in Unit
with Economizer
To install the return air sensor sampling tube:
1. Remove the tube from its shipping location.
2. Open the unit end to access the return air sensor (located on
right-hand partition).
3. Orient the tube’s sampling holes into the return air flow direc-
tion. Position the sampling holes on the bottom of the tube,
facing into the bottom return duct opening.
4. Insert the sampling tube into the return air sensor module
until the tube snaps into position.
5. Replace end panel or outside air hood.
SMOKE DETECTOR TEST MAGNET
Locate the magnet; it is shipped in the control box area.
ADDITIONAL APPLICATION DATA
Refer to the application data sheet titled “Factory-Installed Smoke
Detector, for Small and Medium Rooftop Units 2 to 25 Tons” for
discussions on additional control features of these smoke detectors
including multiple unit coordination.
.
RO
TA
TION
RETURN AIR SAMPLING TUBE
(SHIPPING LOCATION)
RETURN AIR DETECTOR
SAMPLING TUBE
RETURN AIR DETECTOR
SAMPLING TUBE
Содержание 48TC D/E17 Series
Страница 5: ...5 Fig 2 48TC 17 20 Vertical Airflow...
Страница 6: ...6 Fig 3 48TC 17 20 Back View and Condensate Drain Location...
Страница 7: ...7 Fig 4 48TC 17 20 Corner Weights and Clearances...
Страница 8: ...8 Fig 5 48TC 17 20 Bottom View...
Страница 9: ...9 Fig 6 48TC 24 28 Vertical Airflow...
Страница 10: ...10 Fig 7 48TC 24 28 Back View and Condensate Drain Location...
Страница 11: ...11 Fig 8 48TC 24 28 Corner Weights and Clearances...
Страница 12: ...12 Fig 9 48TC 24 28 Bottom View...
Страница 13: ...13 Fig 10 48TC 30 Vertical Airflow...
Страница 14: ...14 Fig 11 48TC 30 Back View and Condensate Drain Location...
Страница 15: ...15 Fig 12 48TC 30 Corner Weights and Clearances...
Страница 16: ...16 Fig 13 48TC 30 Bottom View...
Страница 19: ...19 Fig 16 Roof Curb Details 17 and 20 Size Units...
Страница 20: ...20 Fig 17 Roof Curb Details 24 and 28 Size Units...
Страница 21: ...21 Fig 18 Roof Curb Details 30 Size Units...
Страница 47: ...47 Fig 52 PremierLink Wiring Diagram...
Страница 48: ...48 Fig 53 PremierLink Wiring Diagram with Humidi MiZer System...
Страница 49: ...49 Fig 54 Typical RTU Open System Control Wiring Diagram...
Страница 50: ...50 Fig 55 Typical RTU Open System Control Wiring Diagram with Humidi MiZer System...
Страница 51: ...51 Fig 56 48TC 17 30 Control Wiring Diagram...
Страница 52: ...52 Fig 57 48TC 17 30 Power Wiring Diagram 208 230 3 60...
Страница 53: ...53 Fig 58 48TC 17 30 Power Wiring Diagram 460 3 60...
Страница 54: ...54 Fig 59 48TC 17 30 Power Wiring Diagram 575 3 60...
Страница 55: ...55 Fig 60 48TC 17 30 Control Wiring Diagram with Humidi MiZer System...
Страница 56: ...56 Fig 61 48TC 17 30 Power Wiring Diagram with Humidi MiZer System 208 230 3 60...
Страница 57: ...57 Fig 62 48TC 17 30 Power Wiring Diagram with Humidi MiZer System 460 3 60...
Страница 58: ...58 Fig 63 48TC 17 30 Power Wiring Diagram with Humidi MiZer System 575 3 60...