background image

10

4 - InstaLLatIon

4.1 - Installation of the front fastening supports, the 

rear suspension rail and the rectangular duct outlets

4.1.1 - General

The front fastening supports and the rear suspension rail 
are designed for the installation of the 4GM unit.

This allows these units to be installed while building proceeds 
so that air ducts and the false ceiling can be installed much 
sooner than is usual. The operative section of the 4GM 
need not be installed until just before the tenants arrive. 
They can be ordered for delivery very late in the building 
cycle - a very important financial consideration where major 
installations are involved.

Ducts connect the supports to the diffusers. These are rec-
tangular over a length that should be as short as possible in 
order to minimise pressure losses (pressure losses in rec-
tangular ducts are higher than pressure losses in circular 
ducts). They must then be changed to circular ducts with a 
00 mm diameter, using an adaptor piece. The circular ducts 
are then connected to the diffusers.

The pressure drops through the ducts must be compatible 
with the performance of the 4GM. The internal duct sur-
faces must be as smooth as possible. Avoid sharp bends. 
Check that there are no leaks and that they have not become 
fouled during installation.

Protect the ducts against the ingress of building debris 
which could be sucked into the unit possibly damaging the 
fan, electric heater and the thermostatic damper on the 
diffuser.

As required by local sound emission codes install sound 
absorbing and damping materials.

4.1.2 - Installation of the front fastening support and the 
rear suspension rail

The front suspension supports are supplied as pre-assembled 
sub-assemblies (5 off) and can be disconnected and re-
assembled as required (M8 screws).

Once their installation site has been selected, use a complete 
assembly as a template to mark the positions of the fasten-
ing points.

The supports must be fixed in a very rigid way to the con-
crete slab, suitable for the weight carried. They are designed 
for the installation of the 4GM units (the fixing devices to 
the concrete slab are not supplied by Carrier).

IMPORTANT: When positioning the front fastening sup-
ports take care to avoid damaging or changing the joint 
plates on either side of the supports (these joints ensure 
leak-tightness of the system. After the front fastening 
supports have been installed, fix the rear suspension rail 
parallel to the front supports, following the centre point 
distances below. The rail must be fixed in a very rigid way 
to the concrete slab, suitable for the weight carried (the 
fixing devices to the concrete slab are not supplied by 
Carrier).

VERY IMPORTANT: For correct operation of the 42GM 
unit the front fastening supports and the rear suspension 
rail must be level.

938

25

32

85

85

180

240

40

404

300

225

315

Ø124

150

38

260

225

30

56

886

991

1081

 oblong 13x20

820

88

19

315

ø 124

All dimensions are given in mm.

Oblong 13 x 20

Содержание 42GM

Страница 1: ...42GM Individual Air Treatment Module for Variable Flow Systems Installation operation and maintenance instructions...

Страница 2: ...ail and the rectangular duct outlets 10 4 4 GM installation 11 4 3 Removing a 4 GM unit 13 5 FRESH AIR 14 5 1 Constant fresh air controller optional 14 5 Variable fresh air controller optional 14 6 FA...

Страница 3: ...Carrier linear diffusers in the false ceiling Typically these will be Carrier Moduboot 35BD 35SR units with each one serving an individual room or zone and providing both supply air and return air pat...

Страница 4: ...4 42GM Four main components Front fastening support 42GM Individual Air Treatment Module Duct outlets connecting pieces Rear suspension rail...

Страница 5: ...64 air filter Throwaway 48 mm thick efficiency F6 according to EN 779 EU6 according to EUROVENT 4 5 fire rating medium M1 metal frame Dimensions mm 265 x 255 265 x 255 Pressure drop clean at 125 l s 4...

Страница 6: ...ecommended coil water quality At installation handover and then periodically every year it is advised to analyse the water for bacteria detection of ferro bacteria H S producing and sulphate reducing...

Страница 7: ...g 13x20 820 88 19 315 938 25 32 85 85 180 260 247 240 40 404 300 225 315 124 150 38 260 225 30 56 886 991 1081 1398 oblong 13x20 820 Supply Return Fresh air 2 3 2 42GM with front fastening support wit...

Страница 8: ...e shipping company Do not unpack the units until just before they are due to be installed and make sure they are as close as possible to the installation site when unpacking them Do not stack the unit...

Страница 9: ...circuit breaker If necessary an easily operated emergency stop device such as a punch button switch must cut off the power to all equipment These safety devices shall be sized and installed in accord...

Страница 10: ...nit possibly damaging the fan electric heater and the thermostatic damper on the diffuser As required by local sound emission codes install sound absorbing and damping materials 4 1 2 Installation of...

Страница 11: ...ossible When the site is ready for the modules the front fastening support is firmly fixed to the concrete slab the ducts are connected to the front support the rear suspension rail is firmly fixed to...

Страница 12: ...lar openings on the front fastening support designed to engage with the hooks Fig 3 Then take the 4 GM unit closer to the front fastening support and engage the two hooks in their position movement se...

Страница 13: ...or not supplied by Carrier Disconnect the power supply cable and the earth wire fitted with a flat tag Disconnect the power supply cable of the user inter face Disconnect the power supply cable for th...

Страница 14: ...m3 h constant fresh air controller requires a differential pressure in the range 70 Pa to 200 Pa 16 6 l s 60 m3 h 20 8 l s 75 m3 h 27 7 l s 100 m3 h 36 1 l s 130 m3 h 44 4 l s 160 m3 h Modification pr...

Страница 15: ...efore be removed Removal procedure Remove the 4 GM unit as described in the chapter Removing a 4 GM unit Lay the module on its non removable side fixed by rivets Uninstall the removable side fixed by...

Страница 16: ...le side fixed by rivets Uninstall the removable side fixed by screws Disconnect the water piping from the coil side be careful not to lose the joints Unscrew the two screws A fixing the condensate pan...

Страница 17: ...to make the water connections Every branch of the system must therefore have an isolating valve Insulation cell foam rubber to M1 fire rating Minimum bending radius 106 mm The flexible water pipes ar...

Страница 18: ...able at the connector inside the unit after the filter in air flow direction for the cold water valve or at the controller for the hot water valve Remove the valve motor assembly with its cable Replac...

Страница 19: ...be removed and replaced is an important benefit for service technicians Air filters should be changed regularly F How often this is needed depends on the cleanliness of the working environ ment and th...

Страница 20: ...m3 h Electric heater rotation is ensured by a thermo electric on off actuator This is supplied in parallel with the valve motor of the cold water valve and regulated by the controller The assembly is...

Страница 21: ...4 2123 272 75 5 238 231 170 0 68 114 36 6 2193 240 66 6 277 271 170 0 66 110 38 2 2294 189 52 5 337 334 170 0 64 106 39 3 2360 150 41 6 373 371 140 0 65 92 25 1 1504 284 78 8 61 53 140 0 64 91 26 9 1...

Страница 22: ...ved by smoothing based on the information contained in the electrical data table 0 50 100 150 200 250 300 350 400 450 500 550 600 0 50 100 150 200 250 300 350 400 0 14 28 42 56 69 83 97 111 125 139 15...

Страница 23: ...ion please refer to the selec tion manual installation manual or start up handbook for the Carrier numeric controller 13 2 carrier room thermostats Room thermostats are elegantly designed to be fully...

Страница 24: ...the climate in your region simulation of the heating and cooling loads according to your needs measuring storing and display of the air temperatures and the air distribution pattern taking into accou...

Отзывы: