
FILE NO. SVM-07009
– 75 –
1
Electrolytic capacitor (For
raising pressure, smoothing)
2
Rectifier
11-8-6. Checking method for each part
No.
Part name
Checking procedure
1. Turn OFF the power supply breaker.
2. Discharge all four capacitors completely.
3. Check that safety valve at the bottom of capacitor is not broken.
4. Check that vessel is not swollen or exploded.
5. Check that electrolytic liquid does not blow off.
6. Check that the tester shows the normal charging characteristics in
continuity test.
C12, C13, C14
→
500
µ
F/400V
1. Turn OFF the power supply breaker.
2. Discharge all three capacitors completely.
3. Check that the normal rectification characteristics are show in
continuity test by the tester.
Case that product is good
Pointer swings once, and
returns slowly. When
performing test once again
under another polarity, the
pointer should return.
Diode check
Tester rod
e
d
d
e
\
1
~
Resistance value
in good product
50k
Ω
or more
(0
Ω
in trouble)
\
2
~
\
1
~
\
2
~
Mark
1
2
1
2
C12
C13
MCC-
5009
Soldered
surface
Heat sink IGBT side
C1
4
Содержание 38NYV025M
Страница 16: ...C L C L FILE NO SVM 07009 4 2 Outdoor Unit 16...
Страница 17: ...5 WIRING DIAGRAM 5 1 Indoor Unit FILE NO SVM 07009 17...
Страница 18: ...5 2 Outdoor Unit FILE NO SVM 07009 18...
Страница 80: ...FILE NO SVM 07009 80 P C board layout Solder side...
Страница 91: ...FILE NO SVM 03008 87...