
Operation & Service Manual
Carrier Transicold Europe
31/03/07
Viento - Installation/Rev- #45/54
7. Heat the retractable sleeve to insulate the connector.
8. Strip the battery ground (-) (35mm
2
black) – crimp the
terminal with the adapted crimping tool.
NOTE : Soft-solder is recommended.
9. Install the 80 amps fuse holder as closed as possible from
the 12 Vdc battery.
10. Put grease on the fuse holder connections.
Installation Battery
&
ignition key harness fitting