background image

9

STEP 12

Start--Up

CAUTION

!

UNIT OPERATION AND SAFETY HAZARD

Failure to follow this caution may result in minor personal

injury, equipment damage or improper operation.
To prevent compressor damage or personal injury,

observe the following:

S

Do not overcharge system with refrigerant.

S

Do not operate unit in a vacuum or at negative pressure.

S

Do not disable low pressure switch in scroll compressor

applications.

S

Dome temperatures may be hot.

S

In 3 phase applications, incorrect phasing will cause reverse

rotation, resulting in elevated noise levels, equalized
pressures and reduced current draw. Correct by reversing
power connections L1 and L2 on contactor.

CAUTION

!

PERSONAL INJURY HAZARD

Failure to follow this caution may result in personal

injury.
Wear safety glasses, protective clothing, and gloves when

handling refrigerant and observe the following:

S

Front seating service valves are equipped with Schrader

valves.

CAUTION

!

ENVIRONMENTAL HAZARD

Failure to follow this caution may result in environmental

damage.
Federal regulations require that you do not vent refrigerant to

the atmosphere. Recover during system repair or final unit

disposal.

Follow these steps to properly start up system:

1. After system is evacuated, fully open liquid and vapor

service valves.

2. Unit is shipped with valve stem(s) closed and caps

installed. Replace stem caps after system is opened to

refrigerant flow (back seated). Replace caps finger--tight
and tighten with wrench an additional 1/12 turn.

3. Close electrical disconnects to energize system.
4. Set room thermostat at desired temperature. Be sure set

point is below indoor ambient temperature.

5. Set room thermostat to HEAT or COOL and fan control to

ON or AUTO mode, as desired. Operate unit for 15

minutes. Check system refrigerant charge.

CAUTION

!

UNIT OPERATION AND SAFETY HAZARD

Failure to follow this caution may result in minor personal

injury, equipment damage or improper operation.
To prevent compressor damage or personal injury,

observe the following:

S

Do not overcharge system with refrigerant.

S

Do not operate unit in a vacuum or at negative pressure.

S

Do not disable low pressure switch in scroll compressor

applications.

S

Dome temperatures may be hot.

S

In 3 phase applications, incorrect phasing will cause reverse

rotation, resulting in elevated noise levels, equalized
pressures and reduced current draw. Correct by reversing
power connection L1 and L2 on contactor.

25H

C

A

Содержание 25HCA

Страница 1: ...ION 3 12 Step 1 Check Equipment Jobsite 3 Step 2 Install on Solid Pad 3 Step 3 Clearance Requirements 3 Step 4 Operating Ambient 3 Step 5 Elevate Unit 3 Step 6 Install TXV 3 4 Step 7 Check Defrost The...

Страница 2: ...suitable warning label INSTALLATION RECOMMENDATIONS NOTE In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment 1 Locate unit away from windo...

Страница 3: ...31 1 2 X 31 1 2 9 1 8 6 9 16 24 11 16 35 X 35 9 1 8 6 9 16 28 7 16 A05177 Fig 3 Tiedown Knockout Requirements On rooftop applications locate unit at least 6 in above roof surface STEP 4 Operating Ambi...

Страница 4: ...m down to 2 psig and recover refrigerant 2 Remove coil access panel and fitting panel from front of cabinet 3 Remove TXV support clamp using a 5 16 in nut driver Save the clamp 4 Remove R 22 TXV using...

Страница 5: ...bserve the following S Use a brazing shield S Wrap service valves with wet cloth or use a heat sink material Outdoor units may be connected to indoor section using accessory tubing package or field su...

Страница 6: ...l 1 2 turn 15 ft lb DO NOT OVER TIGHTEN Refrigerant Tubing and Sweat Connections Connect vapor tube to fitting on outdoor unit vapor service valves see Table 2 Connect liquid tubing to adapter tube on...

Страница 7: ...outdoor unit has not shifted during shipment Ensure tubes are not rubbing against each other or any sheet metal Pay close attention to feeder tubes makings sure wire ties on feeder tubes are secure an...

Страница 8: ...lated 35 C minimum wire If thermostat is located more than 100 ft from unit as measured along the control voltage wires use No 16 AWG color coded wire to avoid excessive voltage drop All wiring must b...

Страница 9: ...ng system repair or final unit disposal Follow these steps to properly start up system 1 After system is evacuated fully open liquid and vapor service valves 2 Unit is shipped with valve stem s closed...

Страница 10: ...G FIELD SPLICE CONNECTION OUTDOOR THERMOSTAT EMERGENCY HEAT RELAY SUPPLEMENTAL HEAT RELAY SHR EHR ODT A02325 A97413 Fig 12 Generic Wiring Diagrams See Thermostat Installation Instructions for specific...

Страница 11: ...the start of defrost cycle and restarting of heating cycle It is selected by placing DIP switch 3 on defrost board see Fig 13 in the ON position When Quiet Shift switch is placed in ON position and a...

Страница 12: ...claim refrigerant if temperature is lower Allow a tolerance of 3 F Heating Check Chart Procedure To check system operation during heating cycle refer to the Heating Check Chart on outdoor unit This ch...

Страница 13: ...370 106 101 96 91 377 107 102 97 92 384 109 104 99 94 391 110 105 100 95 398 112 107 102 97 405 113 108 103 98 412 114 109 104 99 419 115 110 105 100 426 117 112 107 102 433 118 113 108 103 440 119 1...

Страница 14: ...longer than 72 hours S Do not install a suction line filter drier in liquid line S POE oils absorb moisture rapidly Do not expose oil to atmosphere S POE oils may cause damage to certain plastics and...