Carrier 25HBR Скачать руководство пользователя страница 10

10

OUTDOOR FAN

RELAY

Y OUTPUT TO PRESSURE

SWITCHES AND CONTACTOR

THERMOSTAT INPUTS

T1 - ENABLES DEFROST
       TIMER. MUST BE 
       ENERGIZED FOR 
       DEFROST TIMER 
       TO START

C - COMMON

O - REVERSING VALVE

SPEEDUP

HK32EA001

DEFROST  THERMOSTAT
MUST BE CLOSED BEFORE
DEFROST TIMER BEGINS

A05332

Fig. 11

---

Defrost Control

Table 4—Defrost Control Speedup--Timing Sequence

PARAMETER

MINIMUM

(MINUTES)

MAXIMUM

(MINUTES)

SPEEDUP

(NOMINAL)

30---minute cycle

27

33

7 sec

50---minute cycle

45

55

12 sec

90---minute cycle

81

99

21 sec

10---minute cycle

9

11

2 sec

5 minutes

4.5

5.5

1 sec

STEP 12

Check Charge

Factory charge and charging method are shown on unit

information plate. To check charge, follow the procedure below
and the subcooling temperature required as shown on charging

table on unit.

Cooling Only Procedure
NOTE

: If subcooling charging conditions are not favorable,

charge must be weighed in accordance with unit rating plate,

±

0.6 oz/ft of 3/8--in. liquid line above or below 15 ft,

respectively. Favorable conditions fall within the ranges given on
the charging chart on the outdoor unit plate.
This system requires charging by the subcooling method.

1. Operate unit a minimum of 10 minutes before checking

charge.

2. Measure liquid service valve pressure by attaching an

accurate gage to service port.

3. Measure liquid line temperature by attaching an accurate

thermistor type or electronic thermometer to liquid line

near outdoor coil.

4. Refer to unit rating plate for required subcooling

temperature.

5. Refer to Table 5.

Find the point where required

subcooling temperature intersects measured liquid service

valve pressure.

6. To obtain required subcooling temperature at a specific

liquid line pressure, add refrigerant if liquid line
temperature is higher than indicated or reclaim refrigerant
if temperature is lower. Allow a tolerance of

±

3

°

F.

Heating Check Chart Procedure

To check system operation during heating cycle, refer to the

Heating Check Chart on outdoor unit. This chart indicates
whether a correct relationship exists between system operating

pressure and air temperature entering indoor and outdoor units. If
pressure and temperature do not match on chart, system

refrigerant charge may not be correct. Do not use chart to adjust

refrigerant charge.

STEP 13

Final Checks

IMPORTANT

: Before leaving job, be sure to do the following:

1. Ensure that all wiring is routed away from tubing and

sheet metal edges to prevent rub--through or wire

pinching.

2. Ensure that all wiring and tubing is secure in unit before

adding panels and covers. Securely fasten all panels and
covers.

3. Tighten service valve stem caps to 1/12--turn past finger

tight.

4. Leave Owner’s Manual with owner. Explain system

operation and periodic maintenance requirements outlined
in manual.

5. Fill out Dealer Installation Checklist and place in customer

file.

Table 5—Required Liquid--Line Temperature

Liquid

Pressure

at Service

Valve

Required Subcooling Temperature

(

°

F)

(PSIG)

5

10

15

20

134

71

66

61

56

141

74

69

64

59

148

77

72

67

62

156

80

75

70

65

163

83

78

73

68

171

86

81

76

71

179

89

84

79

74

187

92

87

82

77

196

95

90

85

80

205

98

93

88

83

214

101

96

91

86

223

104

99

94

89

233

107

102

97

92

243

110

105

100

95

253

113

108

103

98

264

116

111

106

101

274

119

114

109

104

285

122

117

112

107

297

125

120

115

110

309

128

123

118

113

321

131

126

121

116

331

134

129

124

119

346

137

132

127

122

359

140

135

130

125

CARE AND MAINTENANCE

For continuing high performance and to minimize possible

equipment failure, periodic maintenance must be performed on

this equipment.
Frequency of maintenance may vary depending upon geographic

areas, such as coastal applications. See Users Manual for
information.

25H

B

R

Содержание 25HBR

Страница 1: ...LLATION RECOMMENDATIONS 2 INSTALLATION 3 10 Step 1 Check Equipment Jobsite 3 Step 2 Install on Solid Pad 3 Step 3 Clearance Requirements 3 Step 4 Operating Ambient 3 Step 5 Install TXV 3 4 Step 6 Chec...

Страница 2: ...h a suitable warning label INSTALLATION RECOMMENDATIONS NOTE In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment 1 Locate unit away from wi...

Страница 3: ...ve roof surface STEP 4 Operating Ambient The minimum outdoor operating ambient in cooling mode is 55 F and the maximum outdoor operating ambient in cooling mode is 125 F The maximum outdoor operating...

Страница 4: ...r connection to indoor coil Adapter has a 1 4 in male connector for attaching equalizer tube 14 Connect equalizer tube of TXV to 1 4 in equalizer fitting on vapor line adapter Use backup wrench to pre...

Страница 5: ...ciency Refrigerant Tubing and Sweat Connections Connect vapor tube to fitting on outdoor unit vapor service valves see Table 2 Connect liquid tubing to adapter tube on liquid service valve Use refrige...

Страница 6: ...ing Set lengths between 80 and 200 ft horizontal or 20 ft vertical differential 250 ft Total Equivalent Length refer to the Longline Guideline Air Conditioners and Heat Pumps using R 22 IMPORTANT Chec...

Страница 7: ...t must have an uninterrupted or unbroken ground to minimize personal injury if an electrical fault should occur The ground may consist of electrical wire or metal conduit when installed in accordance...

Страница 8: ...Up CAUTION PERSONAL INJURY HAZARD Failure to follow this caution may result in personal injury Wear safety glasses protective clothing and gloves when handling refrigerant and observe the following S...

Страница 9: ...to complete circuit and bring on second bank of supplemental electric heat When thermostat is satisfied its contacts open de energizing contactor and relay All heaters and motors should stop Defrost T...

Страница 10: ...an indicated or reclaim refrigerant if temperature is lower Allow a tolerance of 3 F Heating Check Chart Procedure To check system operation during heating cycle refer to the Heating Check Chart on ou...

Страница 11: ...11...

Страница 12: ...10 W Morris St S Indianapolis IN 46231 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No 25HBR 2SI Replaces 25HBR 1SI P...

Отзывы: