
10
OUTDOOR FAN
RELAY
Y OUTPUT TO PRESSURE
SWITCHES AND CONTACTOR
THERMOSTAT INPUTS
T1 - ENABLES DEFROST
TIMER. MUST BE
ENERGIZED FOR
DEFROST TIMER
TO START
C - COMMON
O - REVERSING VALVE
SPEEDUP
HK32EA001
DEFROST THERMOSTAT
MUST BE CLOSED BEFORE
DEFROST TIMER BEGINS
A05332
Fig. 11
---
Defrost Control
Table 4—Defrost Control Speedup--Timing Sequence
PARAMETER
MINIMUM
(MINUTES)
MAXIMUM
(MINUTES)
SPEEDUP
(NOMINAL)
30---minute cycle
27
33
7 sec
50---minute cycle
45
55
12 sec
90---minute cycle
81
99
21 sec
10---minute cycle
9
11
2 sec
5 minutes
4.5
5.5
1 sec
STEP 12
—
Check Charge
Factory charge and charging method are shown on unit
information plate. To check charge, follow the procedure below
and the subcooling temperature required as shown on charging
table on unit.
Cooling Only Procedure
NOTE
: If subcooling charging conditions are not favorable,
charge must be weighed in accordance with unit rating plate,
±
0.6 oz/ft of 3/8--in. liquid line above or below 15 ft,
respectively. Favorable conditions fall within the ranges given on
the charging chart on the outdoor unit plate.
This system requires charging by the subcooling method.
1. Operate unit a minimum of 10 minutes before checking
charge.
2. Measure liquid service valve pressure by attaching an
accurate gage to service port.
3. Measure liquid line temperature by attaching an accurate
thermistor type or electronic thermometer to liquid line
near outdoor coil.
4. Refer to unit rating plate for required subcooling
temperature.
5. Refer to Table 5.
Find the point where required
subcooling temperature intersects measured liquid service
valve pressure.
6. To obtain required subcooling temperature at a specific
liquid line pressure, add refrigerant if liquid line
temperature is higher than indicated or reclaim refrigerant
if temperature is lower. Allow a tolerance of
±
3
°
F.
Heating Check Chart Procedure
To check system operation during heating cycle, refer to the
Heating Check Chart on outdoor unit. This chart indicates
whether a correct relationship exists between system operating
pressure and air temperature entering indoor and outdoor units. If
pressure and temperature do not match on chart, system
refrigerant charge may not be correct. Do not use chart to adjust
refrigerant charge.
STEP 13
—
Final Checks
IMPORTANT
: Before leaving job, be sure to do the following:
1. Ensure that all wiring is routed away from tubing and
sheet metal edges to prevent rub--through or wire
pinching.
2. Ensure that all wiring and tubing is secure in unit before
adding panels and covers. Securely fasten all panels and
covers.
3. Tighten service valve stem caps to 1/12--turn past finger
tight.
4. Leave Owner’s Manual with owner. Explain system
operation and periodic maintenance requirements outlined
in manual.
5. Fill out Dealer Installation Checklist and place in customer
file.
Table 5—Required Liquid--Line Temperature
Liquid
Pressure
at Service
Valve
Required Subcooling Temperature
(
°
F)
(PSIG)
5
10
15
20
134
71
66
61
56
141
74
69
64
59
148
77
72
67
62
156
80
75
70
65
163
83
78
73
68
171
86
81
76
71
179
89
84
79
74
187
92
87
82
77
196
95
90
85
80
205
98
93
88
83
214
101
96
91
86
223
104
99
94
89
233
107
102
97
92
243
110
105
100
95
253
113
108
103
98
264
116
111
106
101
274
119
114
109
104
285
122
117
112
107
297
125
120
115
110
309
128
123
118
113
321
131
126
121
116
331
134
129
124
119
346
137
132
127
122
359
140
135
130
125
CARE AND MAINTENANCE
For continuing high performance and to minimize possible
equipment failure, periodic maintenance must be performed on
this equipment.
Frequency of maintenance may vary depending upon geographic
areas, such as coastal applications. See Users Manual for
information.
25H
B
R
Содержание 25HBR
Страница 11: ...11...