background image

BLWM operation at heat pump heating speed until end of
prepurge period, then shuts off until end of HSI ignitor on
period (22 sec).

b. When installed with a heat pump, furnace control CPU

automatically holds blower off time to 22 sec during HSI
ignitor on period. After 17 sec of HSI ignitor on period, a
trial-for-ignition sequence occurs as described above for
gas heating. After flame is proved and without blower on
delay, blower motor BLWM then operates on high-gas-
heat speed during defrost. For both single-speed and
2-speed heat pumps, defrost mode is in high-gas heat only.

c. When furnace control R to W/W1 circuit is opened, furnace

control CPU begins normal inducer post-purge period, and
blower motor BLWM remains on for blower off delay
period. If R-G circuit remains closed, blower motor
BLWM reverts to continuous operation.

START-UP PROCEDURES

1. Component test—The furnace features a component test

system to help diagnose a system problem in case of compo-
nent failure. To initiate component test procedure, ensure that
there are no thermostat inputs to control and that all time
delays have expired. Short TWIN/TEST terminal to ground or
C

OM

for 1 to 4 sec. See Fig. 14 for terminal locations.

NOTE:

The component test feature will not operate if control is

receiving any thermostat signals and until all time delays have
expired.
The component test sequence is as follows:

a. The furnace control checks itself, operates inducer motor

on low speed for 7 sec and on high speed for 7 sec, then
stops.

b. The hot surface ignitor is then energized for 15 sec, then

de-energized.

c. The blower motor operates on low-gas-heat/heat pump

low-heat/low-cool/continuous fan speed for 7 sec, then
stops.

d. The blower motor operates on high-gas-heat speed for 7

sec, then stops. The gas valve and humidifier terminal
HUM are not energized for safety reasons.

NOTE:

The EAC terminals are energized when blower is ener-

gized.

e. The blower operates on heat pump high-heat/high-cool

speed for 7 sec, then stops.

2. After all connections have been made, purge gas lines and

check for leaks.

Never purge a line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition to check
for gas leakage. Use a soap-and-water solution to check for
gas leaks. A failure to follow this warning could result in fire,
explosion, personal injury, or death.

3. To operate furnace, follow procedures on operating instruction

label attached to furnace.

4. With furnace operating, set thermostat below room tempera-

ture and observe that furnace goes off. Set thermostat above
room temperature and observe that furnace restarts.

ADJUSTMENTS

1. Set gas input rate.

Furnace gas input rate on rating plate is for installations at
altitudes up to 2000 ft.

In the U.S.A., input rating for altitudes above 2000 ft must be
reduced by 4 percent for each 1000 ft above sea level.
In Canada, input rating must be derated by 10 percent for
altitudes of 2000 ft to 4500 ft above sea level.
Furnace input rate must be within

±

2 percent of input on

furnace rating plate.

2. Determine natural gas orifice size and manifold pressure for

correct input.
a. Obtain yearly heat value average (at installed altitude) from

local gas supplier.

b. Obtain yearly specific gravity average from local gas

supplier.

c. Verify furnace model. Table 10 can only be used for model

58TMA Furnaces.

d. Find installation altitude in Table 10.

NOTE:

For Canada altitudes of 2000 to 4500 ft, use U.S.A.

altitudes of 2001 to 3000 ft in Table 10.

e. Find closest natural gas heat value and specific gravity in

Table 10.

f. Follow heat value and specific gravity lines to point of

intersection to find orifice size and low- and high-heat
manifold pressure settings for proper operation.

EXAMPLE: (0—2000 ft altitude)
Heating value = 1075 Btu/cu ft
Specific gravity = 0.62
Therefore: Orifice No. 45

Manifold pressure: 3.7-in. wc for high heat

1.5-in. wc for low heat

* Furnace is shipped with No. 45 orifices. In this example,
all main burner orifices are the correct size and do not need
to be changed to obtain proper input rate.

g. Check and verify burner orifice size in furnace. NEVER

ASSUME ORIFICE SIZE; ALWAYS CHECK AND
VERIFY.

3. Adjust manifold pressure to obtain input rate.

a. Remove caps that conceal adjustment screws for low- and

high-heat gas valve regulators. (See Fig. 19.)

b. Move setup switch SW-2 on control center to ON position.

(See Fig. 17.) This keeps furnace locked in low-heat
operation.

c. Jumper R and W/W1 thermostat connections on control

center to start furnace.

d. Turn low-heat adjusting screw (5/64 hex Allen wrench)

counterclockwise (out) to decrease input rate or clockwise
(in) to increase input rate.

NOTE:

DO NOT set low-heat manifold pressure less than 1.3-in.

wc or more than 1.7-in. wc for natural gas. If manifold pressure is
outside this range, change main burner orifices.

DO NOT bottom out gas valve regulator adjusting screw.
This can result in unregulated manifold pressure and result in
excess overfire and heat exchanger failures.

NOTE:

If orifice hole appears damaged or it is suspected to have

been redrilled, check orifice hole with a numbered drill bit of
correct size. Never redrill an orifice. A burr-free and squarely
aligned orifice hole is essential for proper flame characteristics.

16

Содержание 2-STAGE 58TMA

Страница 1: ... working on heating equipment observe precautions in the literature on tags and on labels attached to or shipped with the unit and other safety precautions that may apply Follow all safety codes In the United States refer to the National Fuel Gas Code NFGC NFPA No 54 1996 ANSI Z223 1 1996 In Canada refer to the current edition of the National Standard of Canada CAN CGA B149 1 and 2 M95 Natural Gas...

Страница 2: ...s before touching ungrounded objects 7 An ESD service kit available from commercial sources may also be used to prevent ESD damage INTRODUCTION The model 58TMA Series 111 Furnace is available in sizes 65 000 through 123 000 Btuh input capacities The design of the downflow horizontal gas fired furnace is A G A C G A certified for natural and propane gases and for installation on noncombustible floo...

Страница 3: ...ous return air temperature of 60 F db or intermittent operation down to 55 F such as when used with a night setback thermostat Return air temperature must not exceed 85 F db To aid in installation troubleshooting and service a status code label is located on blower component door This label explains how to use the LED status indicated on furnace control which is viewed through the sight glass on d...

Страница 4: ...s When installed parallel with furnace dampers or other means used to control the flow of air must prevent chilled air from entering furnace If dampers are manually operated they must be equipped with means to prevent operation of either unit unless damper is in full heat or full cooling position HAZARDOUS LOCATIONS When furnace is installed in a residential garage it must be installed so that bur...

Страница 5: ...ugh 2 hori zontal ducts the openings and ducts MUST have at least 1 sq in of free area per 2000 Btuh of total input for all equipment within the confined space See Fig 4 and Table 2 c If combustion air is taken from outdoors through a single opening or duct horizontal or vertical commencing within 12 in of the top of the confined space opening and duct MUST have at least 1 sq in of free area per 3...

Страница 6: ... Area of Opening and Duct Sq In Round Pipe In Dia 63 000 100 15 8 5 31 5 7 21 0 6 84 000 100 21 0 6 42 0 8 28 0 6 105 000 105 26 3 6 52 5 9 35 0 7 123 000 123 30 8 7 61 5 9 41 0 8 Table 3 Opening Dimensions In FURNACE CASING WIDTH APPLICATION PLENUM OPENING FLOOR OPENING A B C D 14 3 16 Non Combustible Flooring 12 11 16 19 13 3 8 19 5 8 Combustible Flooring Using KGASB Subbase 11 13 16 19 13 7 16 ...

Страница 7: ... horizontal crawlspace installation is very similar to attic installation refer to Step 4 The installation of a sheet metal shield in front of louvered control panel is covered in Step 4 For a crawlspace installation this same sheet metal shield must be installed above louvered control panel Extend sheet metal shield over furnace top far enough to cover gas pipe entry hole Step 6 Filter Arrangemen...

Страница 8: ...f furnace must be supported when furnace is used in horizontal position 3 8 IN HEX NUT WASHER 4 REQD PER ROD A PREFERRED ROD LOCATION B ALTERNATE ROD LOCATION A B A B B A A B Fig 8 Typical Attic Installation A97516 30 IN MIN WORK AREA 6 MIN TYPE B VENT GAS ENTRY 24 24 SHEET METAL SEDIMENT TRAP MANUAL SHUTOFF GAS VALVE LINE CONTACT ONLY PERMISSIBLE BETWEEN LINES FORMED BY INTERSECTIONS OF THE TOP A...

Страница 9: ...be installed by connecting a tee to riser leading from furnace Connect capped nipple into lower end of tee The capped nipple should extend below level of gas controls See Fig 13 Piping should be pressure tested in accordance with local and national plumbing and gas codes before furnace has been attached If test pressure exceeds 0 5 psig 14 in wc the gas supply pipe must be disconnected from furnac...

Страница 10: ... use ONLY a 3 amp fuse The control will flash code 24 when fuse needs replacement ACCESSORIES 1 Electronic air cleaner EAC A terminal block EAC 1 hot and EAC 2 neutral is provided for EAC connection See Fig 14 The terminals are energized with 115v 1 amp maximum during blower motor operation 2 Humidifier HUM Screw terminals HUM 1 and COM are provided for 24 v humidifier connection The terminals are...

Страница 11: ...satisfactorily Time delay fuse is recommended Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop Fig 15 Heating and Cooling Application Wiring Diagram With 1 Stage Thermostat and Condensing Unit A97443 115 V FUSED DISCONNECT SWITCH WHEN REQUIRED JUNCTION BOX CONTROL BOX 24 V TERMINAL BLOCK TWO WIRE HEATING ONLY FIVE WIRE 1 STAGE THER...

Страница 12: ... response to call for heat See Fig 17 When high heat only switch SW 1 is on it always causes high gas heat operation when R W W1 circuit is closed regardless of the setting of low heat only switch SW 2 This furnace can operate as a 2 stage furnace with a single stage thermostat because furnace control CPU includes a programmed adaptive sequence of controlled operation which selects low gas heat or...

Страница 13: ...witches ALS1 2 used on some horizontal and some downflow models 7 This wire must be connected to furnace sheet metal for control to prove flame 8 Factory connected when LGPS not used RED LS FRS2 RED RED FRS1 WHEN USED ALS1 DSS ORN LGPS YEL NOTE 8 LPS NOTE 8 WHEN USED RED YEL ORN WHEN USED NOTE 6 ALS2 ORN SWITCH 1 2 HEAT SET UP SWITCH NORM HI HT LO HT ON OFF OFF ON BLOWER OFF DELAY SEC SWITCH 3 4 9...

Страница 14: ...If furnace control CPU switches from low gas heat to high gas heat control CPU switches inducer motor IDM speed from low to high The high heat pressure switch relay HPSR closes When inducer motor IDM provides sufficient pressure to close high heat pressure switch HPS high heat gas valve sole noid GV is energized Blower motor BLWM switches speed for high gas heat 5 sec after control CPU switches fr...

Страница 15: ...perating for an additional 90 sec if no other function requires blower motor BLWM operation 5 Heat Pump NOTE An accessory interface kit is required with single speed heat pumps See interface kit Installation Instructions for single speed heat pump thermostat and interface connections No inter face kit is needed for 2 speed heat pumps See 2 speed heat pump Installation Instructions for thermostat c...

Страница 16: ...ve that furnace goes off Set thermostat above room temperature and observe that furnace restarts ADJUSTMENTS 1 Set gas input rate Furnace gas input rate on rating plate is for installations at altitudes up to 2000 ft In the U S A input rating for altitudes above 2000 ft must be reduced by 4 percent for each 1000 ft above sea level In Canada input rating must be derated by 10 percent for altitudes ...

Страница 17: ...ed in low heat operation g Jumper R to W W1 h Let furnace run for 3 minutes in low heat operation i Measure time in sec for gas meter to complete 1 revolu tion Note reading j Refer to Table 10 for cubic ft of gas per hr k Multiply gas rate cu ft hr by heating value Btu cu ft l Move setup switch SW 2 to OFF position and jumper R and W2 thermostat connections See Fig 17 This keeps furnace locked in ...

Страница 18: ...3 3 5 1 4 43 3 6 1 5 43 3 7 1 5 42 3 2 1 3 42 3 3 1 3 2001 825 44 3 8 1 6 43 3 4 1 4 43 3 5 1 5 43 3 6 1 5 43 3 7 1 5 to 850 44 3 6 1 5 44 3 7 1 5 44 3 8 1 6 43 3 4 1 4 43 3 5 1 5 3000 875 44 3 4 1 4 44 3 5 1 4 44 3 6 1 5 44 3 7 1 5 44 3 8 1 6 or 900 44 3 2 1 3 44 3 3 1 4 44 3 4 1 4 44 3 5 1 4 44 3 6 1 5 Canada 925 46 3 8 1 6 45 3 8 1 6 44 3 2 1 3 44 3 3 1 4 44 3 4 1 4 Altitudes 950 46 3 6 1 5 46 ...

Страница 19: ... 5 750 45 3 7 1 5 44 3 2 1 3 44 3 3 1 4 44 3 4 1 4 44 3 5 1 4 775 46 3 6 1 5 46 3 8 1 6 45 3 7 1 5 44 3 2 1 3 44 3 3 1 4 5001 800 46 3 4 1 4 46 3 5 1 5 46 3 7 1 5 46 3 8 1 6 45 3 7 1 5 825 47 3 7 1 5 47 3 8 1 6 46 3 4 1 4 46 3 6 1 5 46 3 7 1 5 to 850 47 3 4 1 4 47 3 6 1 5 47 3 7 1 5 47 3 8 1 6 46 3 5 1 4 875 48 3 7 1 5 48 3 8 1 6 47 3 5 1 4 47 3 6 1 5 47 3 7 1 5 6000 900 48 3 5 1 4 48 3 6 1 5 48 3...

Страница 20: ...ld Pressure High Low U S A Only 600 45 3 7 1 5 44 3 2 1 3 44 3 3 1 4 44 3 4 1 4 44 3 5 1 4 625 46 3 6 1 5 46 3 7 1 5 46 3 8 1 6 45 3 8 1 6 44 3 2 1 3 8001 650 47 3 8 1 6 46 3 4 1 4 46 3 5 1 5 46 3 7 1 5 46 3 8 1 6 675 47 3 5 1 4 47 3 6 1 5 47 3 7 1 5 47 3 8 1 6 46 3 5 1 4 to 700 48 3 7 1 5 48 3 8 1 6 47 3 5 1 4 47 3 6 1 5 47 3 7 1 5 725 48 3 4 1 4 48 3 6 1 5 48 3 7 1 5 48 3 8 1 6 47 3 4 1 4 9000 7...

Страница 21: ...used applies only to furnaces with 5 speed blower motors Follow this same procedure for proper selection of cool and low gas heat speed selection 6 Set thermostat heat anticipator a When using a nonelectronic thermostat the thermostat heat anticipation must be set to match amp draw of electrical Table 11 Gas Rate Cu Ft Hr SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF ...

Страница 22: ...tart up allow furnace to operate for 2 minutes then block flue outlet 100 percent Furnace should cycle off within 2 minutes d Remove blockage and reconnect vent connector to furnace flue collar e Wait 5 minutes and then reset draft safeguard switch 3 Check flow sensing pressure switches This control proves operation of draft inducer blower a Turn off 115 v power to furnace b Remove gas control doo...

Страница 23: ... 1 and SW 2 and blower off delay SW 3 and SW 4 Refer to Tables 6 and 7 3 Verify manual reset switches have continuity 4 Ensure blower and gas control access doors are properly installed 5 Cycle test furnace with room thermostat 6 Check operation of accessories per manufacturer s instruc tions 7 Review User s Manual with owner 8 Leave literature packet near furnace 23 ...

Страница 24: ...ceTraining plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog CALL FOR FREE CATALOG 1 800 644 5544 Packaged Service Training Classroom Service Training Copyright 1997 CARRIER Corp 7310 W Morris St Indianapolis IN 46231 58tma6si Manufacturer reserves the right ...

Отзывы: