4-3. OPERATION
4-3-1. Pre-operation check
Check the following items before starting operation.
(1) Check of the setting point of the chilled water outlet temperature
Make sure that the chilled water outlet temperature is set as specified.
As for the indication of set value, please refer to Section 4-4.
(2) Check of the hot water line
a) Make a daily inspection.(Refer to Section 5.)
b) Check that the valve(s) is open.
NOTE : The chilled water pump and the cooling water pump
should be operated by on-off signal from the chiller.
When
the chiller starts, these equipments also will start automatically.
4-3
Содержание 16LJ-F Series
Страница 2: ......
Страница 25: ...Back to main menu Back to main menu Back to main menu 4 7 ...
Страница 40: ...Manufacturer CARRIER SCS Route de Thil BP49 01122 MONTLUEL CEDEX FRANCE ...