Table 2 — Overall Dimensions, 16DF013-025
English
UNIT
16DF
OVERALL DIMENSIONS (ft-in.)
013
015
018
020
023
025
LENGTH
11-10
11-10
11-10
11-10
11-10
11-10
WIDTH
6- 7
6- 7
7- 8
7- 8
8- 3
8- 3
HEIGHT
7- 9
7- 9
7- 9
7- 9
8- 3
8- 3
SI
UNIT
16DF
OVERALL DIMENSIONS (mm)
013
015
018
020
023
025
LENGTH
3600
3600
3600
3600
3600
3600
WIDTH
1995
1995
2330
2330
2520
2520
HEIGHT
2350
2350
2350
2350
2500
2500
Table 3 — Overall Dimensions, 16DF028-050
English
UNIT
16DF
OVERALL DIMENSIONS (ft-in.)
028
032
036
040
045
050
LENGTH
15-4
15-4
15- 4
15- 4
15-4
15-4
WIDTH
9-4
9-4
9-10
9-10
10-6
10-6
HEIGHT
8-6
8-6
8-10
8-10
9-8
9-8
SI
UNIT
16DF
OVERALL DIMENSIONS (mm)
028
032
036
040
045
050
LENGTH
4660
4660
4660
4660
4660
4660
WIDTH
2850
2850
3000
3000
3200
3200
HEIGHT
2595
2595
2695
2695
2950
2950
RIGGING — The 2 pieces are the high-temperature generator-
separator assembly and absorber-evaporator low-temperature
generator assembly (Fig. 6).
1. Lift each assembly with cable, hooks, and shackles con-
nected to the 4 lifting holes on each assembly. Lifting
from other holes or locations can damage the machine.
2. Position and level the absorber-evaporator-assembly first.
See Position and Level the Equipment section.
3. Move the generator-separator assembly into place beside
the absorber-evaporator assembly.
4. Align connecting piping for generator-separator and absorber-
evaporator assemblies. Make sure serial numbers corre-
spond on both assemblies.
5. See Mounting the Burner section for burner rigging
instructions.
Position and Level the Equipment —
Isolation
pads are not necessary for most installations. However, for
cases where isolation pads are required, refer to Fig. 7 for
typical installation.
Both 16DF machine assemblies must be level within
1
⁄
4
in. per 20 ft (6.3 mm per 6 m), both lengthwise and di-
agonally. To level the machine, proceed as follows:
1. Completely fill 50-ft (15 m) length of clear flexible tub-
ing with water.
2. Use water gage and leveling reference points stamped on
tube sheets to level machine.
3. Level machine with shims until requirements are met. If
isolation assembly is used, shim under the soleplate. Be
sure matching piping is in alignment.
High-Temperature Generator-Separator Assembly
Fig. 6 — Rigging 2-Piece Units, Sizes 16DF023-050
Absorber-Evaporator Low-Temperature Generator Assembly
NOTES:
1. Be sure only the machine base is on the isolation pad at each
corner.
2. Shim under soleplate to level machine.
Fig. 7 — Typical Isolation Assembly
6