CL-1
START-UP CHECKLIST
I. PRELIMINARY INFORMATION
COMPRESSOR BEARING UNIT:
MODEL NO. ___________________
SERIAL NO. ___________________
09AZ UNIT:
MODEL NO. ___________________
SERIAL NO. ___________________
FIELD-INSTALLED ACCESSORIES ________________________________________________________________________
________________________________________________________________________________________________________
II. PRE-START-UP
INDOOR/COMPRESSOR UNIT
IS THERE ANY SHIPPING DAMAGE? ___________________ (Y/N) ________
IF SO, WHERE: __________________________________________________________________________________________
WILL THIS DAMAGE PREVENT UNIT START-UP?
(Y/N) ________
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?
(Y/N) ________
HAS THE GROUND WIRE BEEN CONNECTED:
(Y/N) ________
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?
(Y/N) ________
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?
(Y/N) ________
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT? (Y/N) ________
DO THE FAN BELTS HAVE PROPER TENSION?
(Y/N) ________
HAS CORRECT FAN ROTATION BEEN CONFIRMED?
(Y/N) ________
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DAINAGE?
(Y/N) ________
ARE PROPER AIR FILTERS IN PLACE?
(Y/N) ________
CONTROLS
HAVE THERMOSTAT, INDOOR-FAN CONTROL AND CONDENSER FAN CONTROL RELAY WIRING
CONNECTIONS BEEN MADE AND CHECKED?
(Y/N) ________
ARE ALL WIRING TERMINALS (including main power supply) TIGHT? (Y/N) ________
HAS CRANKCASE HEATER (IF EQUIPPED) ON UNIT BEEN ENERGIZED FOR 24 HOURS? (Y/N) ________
09AZ UNIT
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?
(Y/N) ________
HAS THE GROUND WIRE BEEN CONNECTED?
(Y/N) ________
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?
(Y/N) ________
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?
(Y/N) ________
HAS UNIT BEEN PROPERLY SECURED TO BUILDING STRUCTURE?
(Y/N) ________
HAS CORRECT FAN ROTATION BEEN CONFIRMED?
(Y/N) ________
PIPING
HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, CONDENSER, EVAPORATOR, TXV’s
(Thermostatic Expansion Valve), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS WITH A
LEAK DETECTOR? (Y/N) ________
LOCATE, REPAIR, AND REPORT ANY LEAKS
HAVE ALL COMPRESSOR SERVICE VALVES BEEN FULLY OPENED (Backseated)? (Y/N) ________
HAVE LIQUID LINE SERVICE VALVES BEEN OPENED?
(Y/N) ________
IS THE OIL LEVEL IN THE COMPRESSOR CRANKCASE ON THE UNIT IN VIEW IN THE COMPRESSOR SIGHT
GLASS (IF APPROPRIATE)?
(Y/N) ________
HAS CONDENSER PRESSURE RELIEF BEEN PROVIDED? (Y/N) ________