PIPING WORK 

 

REFRIGERANT PIPING 

 

 

Use correct size and good condition field supply tubing of 
refrigerant grade. 

 

 

Run refrigerant tubes as straight as possible. Avoid 
unnecessary turns and bends. 

 

 

Suspend refrigerant tubes so that they do not transmit 
vibration to structure. 

 

 

Also when passing refrigerant tubes through wall, seal 
opening so vibration is not transmitted to structure. 

 

 

Leave some slack in refrigerant tubes between structure and 
unit to absorb vibration. 

 

 

NOTE:

 The longer the interconnecting piping, the lower the    

cooling capacity of the unit. See table 2.  

 
 

Table 2    Reduction in capacity vs increase in pipe length 

EQUIVALENGHT PIPING LENGTH (ONE WAY

MODEL 

07KHP 

5m 10m 15m 20m 25m 

012 

0  1.7% 2.7% 3.7% 4.8% 

018 

0  1.6% 2.8% 3.8% 4.9% 

024 

0  1.7% 3.0% 4.0% 5.4% 

040 

0  1.8% 3.0% 4.2% 5.6% 

060 

0  2.1% 3.8% 4.7% 5.9% 

090 

0  2.5% 4.3% 5.2% 6.3% 

 
The permission piping for recommended combinations as per Table 3 
and fig. 3. 
 
 

Table 3   Vertical and horizontal separation between fan coil and 

condensing unit. 

MAX. LIFT, H  m (ft) 

MODEL 

07KHP 

MAX. DISTANCE, L 

m (ft) 

CDU ABOVE 

FCU 

CDU BELOW 

FCU 

012 

15  (50) 

7.5 (25) 

5.0 (16) 

018 

15 (50) 

10 (33) 

7.5 (25) 

024 

15 (50) 

10 (33) 

7.5 (25) 

040 

18 (60) 

10 (33) 

7.5 (25) 

060 

18 (60) 

10 (33) 

7.5 (25) 

090 

18 (60) 

15 (50) 

10 (33) 

 
 
 

 
 
  
 
 
 
 
 
 
 
 
                

 

                      

 

 
SIGHT GLASS AND FILTER DRIER 

 
Sight glass and filter drier are factory supplied and field installed 
applicable for model 07KHP036,048, 060 and 090 only. Warranty will be 
voided if these models were not fitted with external filter drier in the field 
installation. 
 
 
 

 

TUBING CONNECTIONS AND LEAK TEST 
 

 

Both suction and liquid are equipped with flare type 
connections. (except for Model 090 uses sweat connection). 

 

 

Assemble flare joint by aligning tubing with machine surface 
of fitting. Start run onto threads by turning backwards first 
then forwards. 

 

 

All lines should be assembled with type “L” or quarter hard 
drawn refrigeration grade copper tubing and not with copper 
water pipe. 

 
 

Use the following brazing alloys: 

 

Copper to Copper --------------  5% Silver Alloy (no flux) 
Copper to Steel or Brass ----  35% Silver Alloy (no flux) 

 

 

Remove cap and Schrader core from service port to protect 
seals from heat damage. Wrap service valve with wet rag 
before applying heat. Flow dry nitrogen into a service port and 
through the tubing while brazing to prevent pipe oxidation. 

 

 

Pressurize line set and coil through service fittings with dry 
nitrogen to 150 psig maximum (or refer to Carrier Standard 
Service Techniques Manual, chapter 1, section 1-6) If a leak 
is found, recover pressure and repair all leaks. 

 
 

WARNING:  

DO NOT USE OXYGEN TO PURGE LINES OR PRESSURE SYSTEM 
FOR LEAK TEST. OXYGEN REACTS VIOLENTLY WITH OIL, WHICH 
CAN CAUSE AN EXPLOSION RESULTING IN SEVERE PERSONAL 
INJURY OR DEATH

 
 
 
 

 PIPING INSULATION 
 

Insulate both suction and liquid lines as per Fig. 4  

 

 

 
 
 
 
 
 
 
 
 
 
 

                        FIG. 4      PIPING INSULATION 

 

 
 
 
 
 
 
 

Содержание 07KHP

Страница 1: ...ny transmission of noise and vibration to the ceiling or walls Provide enough pipe flexibility before fixing unit to the structure Provide access panel in ceiling Make sure the panel is located near the unit for easy maintenance and servicing After the unit is installed and pipe work are completed be sure to insulate the unit s surroundings with acoustic treatment An acoustic type insulation can b...

Страница 2: ...8 6 1 1 8 REFRIGERANT CONNECTIONS Liquid mm in Flare Type 6 35 6 35 9 52 3 8 9 52 3 8 9 52 3 8 S 15 8 5 8 High Press PSIG 426 7 320 20 CONTROL PRESSURESTAT SETTINGS Open Close pressure settings Low Press PSIG n a 27 4 67 7 POWER SOURCE V Ph Hz NOMINAL V 208 230 1 60 230 3 60 PERMISSIBLE MIN MAX VOLTAGE V 197 253 REFRIGERANT CONTROL DEVICE IN UNIT Capillary Tube Capillary Accurator RLA Rated Load A...

Страница 3: ... supplied and field installed applicable for model 07KHP036 048 060 and 090 only Warranty will be voided if these models were not fitted with external filter drier in the field installation TUBING CONNECTIONS AND LEAK TEST Both suction and liquid are equipped with flare type connections except for Model 090 uses sweat connection Assemble flare joint by aligning tubing with machine surface of fitti...

Страница 4: ...eak is detected the refrigerant should be recovered before repairing the leak This is in compliance with the Clean Air Act WATER PIPING Water inlet and outlet are equipped with 25 4mm or 1 FPT female pipe thread Make sure that internal water piping is clean Use correct size wrenches and proper sealing for water inlet and outlet connections Do not over tighten the connections Suspend or use vibrati...

Страница 5: ...5 FIG 6 CEILING MOUNTED INSTALLATION FIG 7 FLOOR MOUNTED INSTALLATION ...

Страница 6: ...balance is satisfactory as it is below the maximum allowable 2 Operation on improper line voltage or excessive phase imbalance constitutes abuse and may cause damage to electrical components OPERATION AND START UP PRELIMINARY CHECKS Before operating the unit be sure the following are in order 1 All wiring connections are correct and tight 2 All barriers covers and panels are in place 3 Electrical ...

Страница 7: ... maintenance LUBRICANT Compressor contains factory oil charge Replace oil when lost See table 3 for oil recharge and refer to Carrier Manual Chapter 1 page 1 21 for oil recharging procedure CLEANING HEAT EXCHANGER Use a tank with 5 phosphoric acid Pump the cleaning liquid through the plate heat exchanger at 1 5 times normal flow rate for optimum cleaning preferably in back flush mode Then rinse wi...

Страница 8: ......

Страница 9: ...1 1 22 2 23 3 24 4 12 5 6 7 7 8 9 4 11 1 12 8 14 4 16 1 17 8 19 4 20 6 22 2 23 3 25 15 5 3 9 5 6 6 7 8 3 10 11 7 13 3 15 16 7 18 3 19 4 21 1 22 2 23 9 18 3 3 3 5 8 7 2 8 9 10 6 11 7 13 3 15 16 7 18 3 20 21 1 22 8 21 1 7 5 6 7 2 8 9 10 6 11 7 13 3 15 16 7 18 3 20 21 7 23 9 3 3 5 6 7 8 3 10 11 7 13 3 15 6 17 2 18 9 20 6 26 7 2 8 4 4 6 7 8 3 10 11 7 13 9 15 6 17 2 19 4 29 4 4 4 6 1 8 3 10 6 12 2 14 4...

Страница 10: ...10 FIG 8 WIRING DIAGRAM 07KHP012 FIG 9 WIRING DIAGRAM 07KHP018 024 ...

Страница 11: ...11 FIG 10 WIRING DIAGRAM 07KHP040 050 FIG 11 WIRING DIAGRAM 07KHP060 ...

Страница 12: ...12 FIG 12 WIRING DIAGRAM 07KHP090 FIG 13 RECOMMENDED SERVICE CLEARANCES ...

Страница 13: ...H LOOSE LEADS AT COMPRESSOR COMPRESSOR STUCK COMPRESSOR POWER SUPPLY OPEN COMPRESSOR INTERNAL PROTECTION OPEN OVERCHARGED OR NONCONDENSABLES IN SYSTEM OPEN SHORTED OR GROUNDED COMPRESSOR MOTOR WINDING HIGH SUPERHEAT COMPRESSOR BEARINGS DEFECTIVE FAN CAPACITOR LINE VOLTAGE TOO HIGH OR LOW LOW REFRIGERANT CHARGED RESTRICTED DISCHARGE LINE INTERNAL PRESSURE RELIEF OPEN DEFECTIVE COMPRESSOR VALVES CON...

Страница 14: ...inlupa City Tel No 63 2 850 1367 Fax No 63 2 809 9979 Website www carrier com ph Manufacturer reserve the right to discontinue or change at any time specifications or designs without notice and without incurring obligations Form 07KHP 4IOM Replaces 07KHP 3IOM Concepcion Carrier Air conditioning Company ...