7. Start-Up
IMPORTANT INSTRUCTIONS/WARNINGS:
1.
Before connecting the water to the pumping station, flush the supply pipe for around 10 minutes by piping water directly into
the drain.
2.
Before starting the pumping station, verify that the humidifier is in full operational condition. The hydraulic and electrical
equipment should not be locked out. There should not be any water leaks and the electrical components must be dry.
3.
If a hazard does seem to exist, the system should be locked out immediately and the problems corrected before continuing.
7.1 Startup
Checklist
Before starting the humidifier, the following should be checked:
Water is connected, the line has been flushed, and external valves are open.
Drain is connected and run to an open drain.
Electricity is connected in accordance with instructions, local codes and data labels in the unit and zone control cabinet.
The external power fuses/disconnect are installed and intact in pumping station and zone control cabinet.
All control wiring is done and tested in pumping station and zone control cabinet.
Airflow switch is wired to open on air flow loss in control cabinet.
Hi-limit humidistat is wired to open on humidity rise above set point in control cabinet.
Unit wires have been checked to make sure they and all connectors are tight from shipping in pumping station and zone control
cabinet.
The high pressure water outlet piping is run correctly to the distribution system.
The proper capacities for each stage of the manifold system are installed in the zone control cabinet.
For a multi-zone system, the addresses of the zone controls cabinets are changed.
For a duplex system, the addresses of the pumping stations are changed.
7.2
Re-addressing the Controllers and Displays for Multi-zone or Duplex Systems
The default addresses for a zone control cabinet are “1” for the PCO3 controller and “30” for the PGD display. The default addresses
for the pumping station cabinet are “16” for the PCO3 controller and “32” for the PGD display. For multi-zone or duplex systems, the
additional cabinets on the pLAN must have their addresses changed before they can operate correctly.
When changing addresses, the pLAN connections between each of the PCO3 controllers must be removed.
The connections
are restored once the readdressing is completed.
For multi-zone system,
o
the PCO3 controllers in the additional cabinets can be assigned addresses sequentially upward.
o
the PGD displays in the additional cabinets can be assigned addresses sequentially downward.
For a duplex system,
o
the PCO3 controller in the additional pumping station cabinet must be changed to “17.”
o
the PGD display in the additional pumping station cabinet must be changed to “31.”
pLAN ADDRESS TABLE
PCO3 Controller
PGD Display
Default Multi-zone Duplex Default Multi-zone Duplex
Pumping
Station
16 N/C 17
32 N/C 31
Zone
Control
1
2, 3, …, 15
N/A
30
29, 28, …, 18
N/A
Содержание humiFog UA1K0HM00
Страница 1: ...humiFog UA pressure atomizing 1000 5000 kg hr READ AND SAVE THESE INSTRUCTIONS ...
Страница 33: ...34 of 55 Fig 11 a 11 4 1 Replacement parts for the hydraulics and drive assembly ...
Страница 34: ...35 of 55 Replacement parts for the electrical panel Fig 11 b ...
Страница 37: ...38 of 55 11 5 4 Pump spare parts FOR PUMPING STATIONS UA1K0H 000 for voltage 66 SERIES TSF BRASS ...
Страница 38: ...39 of 55 FOR PUMPING STATIONS UA1K8H 000 UA2K5H 000 for voltage 66 SERIES TSF BRASS ...
Страница 39: ...40 of 55 FOR PUMPING STATIONS UA1K0H 001 UA1K8H 001 UA2K5H 001 for voltage 66 SERIES TSF SS ...
Страница 40: ...41 of 55 FOR PUMPING STATIONS UA3K5H 000 UA5K0H 000 for voltage Emperor HT Brass ...
Страница 41: ...42 of 55 FOR PUMPING STATIONS UA3K5H 001 UA5K0H 001 for voltage PARTS LIST KEZ36A ...
Страница 44: ...45 of 55 11 6 Wiring Schematic Figure 11 c ...
Страница 52: ...53 of 55 NOTES ...
Страница 53: ...54 of 55 NOTES ...
Страница 54: ...55 of 55 030222120 Rel 5 2 02 12 2013 ...